Letting results · Mississippi Department of Transportation
September 22, 2026 letting results
Fast-published project results from the freshest available state snapshot.
12trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| 109518301 | Oktibbeha Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximately 7.3 miles of US 82 from Choctaw County Line to the beginning of the Starkville Bypass | 4 | #1 Cook & Son, LLC: $11.5M; #2 APAC - Mississippi, Inc.: $11.5M; #3 Falcon Contracting Company, Inc.: $12.8M; #4 Ste-Bil Grading Inc.: $13.3M | $11.5M | $49.2M | $26,683 |
| 109707301 | Lowndes & Monroe Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3) | 6 | #1 Xcavators, Inc.: $715,529; #2 Ste-Bil Grading Inc.: $765,220; #3 Century Construction Group, Inc.: $837,922; #4 Phillips Contracting Co., Inc.: $936,954; #5 Cook & Son, LLC: $1.5M; #6 T. L. Wallace Construction, Inc.: $2.0M | $715,529 | $6.7M | $49,691 |
| 110037301 | Alcorn Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B) | 7 | #1 Phillips Contracting Co., Inc.: $974,079; #2 Ste-Bil Grading Inc.: $1.1M; #3 Gibson & Associates, Inc.: $1.2M; #4 Century Construction Group, Inc.: $1.3M; #5 Concrete Strategies, LLC: $1.4M; #6 Talbot Brothers Contracting Co., Inc.: $1.7M; #7 Southern Road & Bridge, LLC: $2.8M | $974,079 | $10.4M | $159,201 |
| 110042301 | Washington Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 over Bogue Phalia (Bridge No. 11.1 | 4 | #1 Gibson & Associates, Inc.: $1.8M; #2 Concrete Strategies, LLC: $2.0M; #3 Hope Enterprises, LLC: $2.4M; #4 Southern Road & Bridge, LLC: $4.0M | $1.8M | $10.2M | $145,757 |
| 110064301 | DeSoto & Tate Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approximately 2.2 miles north of the Desoto/Tate County Line to the Tate/Panola County Line | 3 | #1 Vance Brothers, LLC: $8.2M; #2 T. L. Wallace Construction, Inc.: $8.2M; #3 INTERMOUNTAIN SLURRY SEAL, INC.: $10.1M | $8.2M | $26.5M | $2,282 |
| 110067301 | OGFC lift approximately 7.3 miles on I-55 from Church Road to Heindl Road, Bridge Repair on I-55 over Church Road (Bridge Nos. 112.3A , 112.3B) & Fog Seal approximately 7.2 miles on I-55 from Hiendl Road to the Yazoo County Line, known as Federal Aid Project Nos. IM-0055-02(291) / 110067301, NHPP-0055-02(287) / 110043301 & IM-0055-02(292) / 110068301 in Madison County. | 0 | Not available | Pending | Not available | Not available |
| 110120301 | Union Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9) | 6 | #1 Phillips Contracting Co., Inc.: $139,966; #2 Hemphill Construction Company, Inc.: $190,200; #3 J. M. Duncan, Inc.: $192,188; #4 Gibson & Associates, Inc.: $192,810; #5 Century Construction Group, Inc.: $199,659; #6 Talbot Brothers Contracting Co., Inc.: $251,764 | $139,966 | $1.2M | $50,234 |
| 110184301 | Yazoo Bridge Repair on SR 433 over Mound Creek (Bridge No. 11.6) | 4 | #1 Gibson & Associates, Inc.: $125,181; #2 Hemphill Construction Company, Inc.: $161,354; #3 Key, LLC: $227,628; #4 Hope Enterprises, LLC: $260,483 | $125,181 | $774,646 | $36,173 |
| 110211301 | DeSoto & Panola & Tate Installation of Audible Thermoplastic Traffic Markings & Thermoplastic Pavement Markings on US 51 for approximately 12.7 miles from the Tate County Line to Hernando, approximately 18.8 miles from Batesville to the Tate County Line, and approximately 9.7 miles from the Panola County Line to Senatobia & Coldwater to the Desoto County Line | 2 | #1 Riverside Traffic Systems, Inc.: $1.6M; #2 ROADSAFE TRAFFIC SYSTEMS, INC.: $3.3M | $1.6M | $4.9M | $1.7M |
| 110212301 | Marshall Safety Improvements & Pavement Markings approximately 30.3 miles of MS 309 from Byhalia to MS 4 and on MS 349 from MS 701 to the Union County Line | 2 | #1 Riverside Traffic Systems, Inc.: $1.0M; #2 ROADSAFE TRAFFIC SYSTEMS, INC.: $1.7M | $1.0M | $2.7M | $694,158 |
| 110222301 | Coahoma Mill & Overlay approximately 2.5 miles of US 49 from SR 1 to the Isle of Capri Parkway | 1 | #1 Lehman - Roberts Company: $2.0M | $2.0M | $2.0M | Not available |
| 110227301 | Covington Bridge Repair on SR 532 over Stream (Bridge No. 13.5) | 6 | #1 T. L. Wallace Construction, Inc.: $496,786; #2 Joe McGee Construction Company, Inc.: $528,201; #3 Hope Enterprises, LLC: $528,490; #4 Hemphill Construction Company, Inc.: $528,832; #5 Key, LLC: $696,015; #6 Ste-Bil Grading Inc.: $838,000 | $496,786 | $3.6M | $31,415 |
Back to the state market · How results are calculated
Last updated November 7, 2026 with source data through October 27, 2026. See the methodology and data dictionary or report a correction.