Mississippi roadwork,
by the numbers.
A current, source-documented view of the contractors, competition, and project mix shaping the Mississippi heavy-highway market.
The Mississippi public bid market at a glance
Mississippi Department of Transportation has let 1,101 projects represented in this dataset. Competitive bid tabs average 2.8 bidders per job.
- Data through
- October 27, 2026
- Page generated
- October 31, 2026
- History begins
- January 1, 2020
- Source
- Mississippi Department of Transportation
Top work types by awarded volume
| Work type | Jobs | Volume |
|---|---|---|
| Overlay | 458 | $2.6B |
| Construction | 373 | $2.0B |
| Bridge | 41 | $813.9M |
| Bridge Replacement | 45 | $627.0M |
| Intersection | 31 | $177.1M |
| Bridge Repair | 90 | $165.1M |
| Widening | 4 | $164.4M |
| Safety | 16 | $135.9M |
Top contractors by apparent low-bid volume
| Contractor | Wins | Jobs bid | Dollars won |
|---|---|---|---|
| APAC - Mississippi, Inc. | 180 | 309 | $1.1B |
| W. G. Yates & Sons Construction Company | 6 | 34 | $571.6M |
| T. L. Wallace Construction, Inc. | 26 | 78 | $451.8M |
| Eutaw Construction Company, Inc. | 5 | 13 | $440.0M |
| Lehman-Roberts Company | 51 | 84 | $367.0M |
| Huey P Stockstill, LLC | 21 | 39 | $361.7M |
| Talbot Brothers Contracting Co., Inc. | 22 | 58 | $296.9M |
| Dickerson & Bowen, Inc. | 73 | 134 | $283.0M |
| Necaise Brothers Construction Co., Inc. | 7 | 13 | $275.8M |
| Key, LLC | 67 | 213 | $238.6M |
October 27, 2026
Simpson Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard Creek (Bridge No. 77.6)
Apparent low bidder: Chris Albritton Construction Company, Inc. · 1 bidder
See all letting results from October 27, 2026
Geographies, prices, and contractors
Hinds · Pontotoc · Alcorn · Marshall · Attala · Simpson · Madison · Lauderdale · Pike · Pearl River · Warren · Franklin · Mobilization · Maintenance of Traffic · Asphalt for Tack Coat · Fine Milling of Bituminous Pavement, All Depths · Additional Construction Signs · Temporary Traffic Stripe, Detail · Temporary Traffic Stripe, Continuous Yellow · Temporary Traffic Stripe, Continuous White · APAC - Mississippi, Inc. · Key, LLC · Century Construction Group, Inc. · Dickerson & Bowen, Inc. · Gibson & Associates, Inc. · Joe McGee Construction Company, Inc. · Lehman-Roberts Company · Warren Paving, Inc.
About this Mississippi DOT dataset
How much Mississippi DOT work is included?
This hub includes 1,101 trusted contracts totaling $6.8B, beginning January 1, 2020.
Where does this data come from?
BidCrew collects public letting, contract, bid-tabulation, and engineer-estimate records published by Mississippi Department of Transportation. Quarantined or future records are excluded.
How often is this page updated?
The page is generated from an immutable public snapshot. The current data runs through October 27, 2026, and the visible update date shows when this snapshot was created.
How is estimate accuracy calculated?
Estimate accuracy compares the apparent low bid with the source-reported engineer estimate for 1,097 contracts and reports the median ratio.