Letting results · Mississippi Department of Transportation

July 28, 2026 letting results

Fast-published project results from the freshest available state snapshot.

12trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
100881301& BR-0013-02(029) / 106971301 Simpson Bridge Replacement on SR 28 between Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard Creek (Bridge No. 77.6)4#1 Chris Albritton Construction Company, Inc.: $25.1M; #2 Cotton Creek Transport, Inc.: $29.5M; #3 Century Construction Group, Inc.: $33.9M; #4 T. L. Wallace Construction, Inc.: $35.1M$25.1M$123.6M$4.5M
106971301& BR-0013-02(029) / 106971301 Simpson Bridge Replacement on SR 28 between Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard Creek (Bridge No. 77.6)4#1 Chris Albritton Construction Company, Inc.: $25.1M; #2 Cotton Creek Transport, Inc.: $29.5M; #3 Century Construction Group, Inc.: $33.9M; #4 T. L. Wallace Construction, Inc.: $35.1M$25.1M$123.6M$4.5M
108287301& 108287302 Holmes & Attala Bank Stabilization on SR 12 over Big Black River (Bridge No. 83.4)10#1 Wilco, Inc.: $2.7M; #2 Joe McGee Construction Company, Inc.: $2.9M; #3 Hemphill Construction Company, Inc.: $3.1M; #4 Maynord Landscaping Co., Inc.: $3.1M; #5 Phillips Contracting Co., Inc.: $3.1M; #6 Fordice Construction Company: $3.3M; #7 T. L. Wallace Construction, Inc.: $3.7M; #8 Xcavators, Inc.: $3.8M; #9 Key, LLC: $4.4M; #10 Looks Great Services of MS, Inc.: $5.4M$2.7M$35.3M$203,484
108865301Yazoo Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)5#1 Century Construction Group, Inc.: $6.7M; #2 Ste-Bil Grading Inc.: $7.3M; #3 Cotton Creek Transport, Inc.: $7.4M; #4 Key, LLC: $7.5M; #5 Hemphill Construction Company, Inc.: $8.6M$6.7M$37.6M$572,284
109338301Forrest Intersection Improvements on MS 42 from I-59 to Sunrise Road3#1 Warren Paving, Inc.: $6.6M; #2 T. L. Wallace Construction, Inc.: $6.8M; #3 Dunn Roadbuilders, LLC: $7.4M$6.6M$20.7M$228,756
109669301Lamar Bridge Repair on US 98 over I-59 (Bridge No. 149.1)4#1 Key, LLC: $955,686; #2 Hemphill Construction Company, Inc.: $1.0M; #3 Gibson & Associates, Inc.: $1.1M; #4 Century Construction Group, Inc.: $1.2M$955,686$4.3M$94,158
109879301Harrison Widening on I-10 at MS 605 WB Ramp3#1 Necaise Brothers Construction Co., Inc.: $1.4M; #2 Southern Colonial Construction LLC: $1.4M; #3 JLB Contractors, LLC: $1.6M$1.4M$4.4M$20,267
109902301Lee Traffic Signal and Interchange Modifications on US 45 & US 2785#1 Cook & Son, LLC: $1.5M; #2 J. M. Duncan, Inc.: $1.7M; #3 Phillips Contracting Co., Inc.: $1.7M; #4 Ste-Bil Grading Inc.: $1.9M; #5 Century Construction Group, Inc.: $2.0M$1.5M$8.8M$151,707
109991301& SP-0349-00(032) / 109993301 Clarke Micro-Surface approximately 14 miles of SR 512 & SR 5132#1 T. L. Wallace Construction, Inc.: $3.8M; #2 Vance Brothers, LLC: $4.8M$3.8M$8.6M$933,002
110008301Hinds Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to South of Edwards3#1 A J Construction, Inc.: $4.3M; #2 APAC - Mississippi, Inc.: $4.4M; #3 Dickerson & Bowen, Inc.: $4.4M$4.3M$13.2M$65,881
110038301Tishomingo Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)8#1 Century Construction Group, Inc.: $2.7M; #2 Gibson & Associates, Inc.: $3.0M; #3 Talbot Brothers Contracting Co., Inc.: $3.1M; #4 Key, LLC: $3.3M; #5 Phillips Contracting Co., Inc.: $3.7M; #6 Cekra, Inc.: $4.4M; #7 Concrete Strategies, LLC: $4.8M; #8 Southern Road & Bridge, LLC: $5.2M$2.7M$30.0M$315,998
503889301Hinds Building Improvements at MDOT Parking Garage Downtown4#1 Python Corporation: $1.2M; #2 Chris Albritton Construction Company, Inc.: $1.4M; #3 Concrete Strategies, LLC: $1.7M; #4 United Restoration & Preservation, Inc.: $3.0M$1.2M$7.4M$269,551

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through September 1, 2026. See the methodology and data dictionary or report a correction.