Letting results · Mississippi Department of Transportation

June 23, 2026 letting results

Fast-published project results from the freshest available state snapshot.

8trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
108954301& STP-0339-00(008) / 109462301 Clarke & Jasper Thin Lift Overlay approximately 8.3#1 Dunn Roadbuilders, LLC: $7.2M; #2 Walters Construction Co., Inc.: $7.5M; #3 APAC - Mississippi, Inc.: $8.1M$7.2M$22.8M$252,192
109064301Desoto Roundabout on US 51 at Green T Road6#1 Talbot Brothers Contracting Co., Inc.: $4.3M; #2 Phillips Contracting Co., Inc.: $4.9M; #3 Cook & Son, LLC: $5.0M; #4 Ste-Bil Grading Inc.: $5.0M; #5 Century Construction Group, Inc.: $5.6M; #6 Xcavators, Inc.: $5.9M$4.3M$30.8M$553,454
109680301Madison Bridge Repair on SR 22 over Persimmon Creek (Bridge No. 32.5)7#1 Hemphill Construction Company, Inc.: $82,551; #2 Hope Enterprises, LLC: $97,206; #3 Wilco, Inc.: $108,820; #4 Joe McGee Construction Company, Inc.: $123,490; #5 Ste-Bil Grading Inc.: $156,360; #6 Key, LLC: $169,882; #7 Simmons Erosion Control, Inc.: $172,668$82,551$910,977$14,655
109967301Lawrence Overlay approximately 8.5 miles of MS 587 from the Marion County Line to the Northern Ervin-Reid Circle Drive4#1 Dickerson & Bowen, Inc.: $4.1M; #2 Walters Construction Co., Inc.: $4.1M; #3 APAC - Mississippi, Inc.: $4.4M; #4 Dunn Roadbuilders, LLC: $4.8M$4.1M$17.4M$7,043
110062301& IM-0010-01(188) / 110063301 Harrison Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.2#1 Warren Paving, Inc.: $9.9M; #2 Huey P. Stockstill, LLC: $10.4M$9.9M$20.4M$493,702
309572301Highway Construction Project3#1 Arkansas Sign & Barricade, Inc.: $592,324; #2 Riverside Traffic Systems, Inc.: $602,324; #3 Time Striping, Inc.: $719,507$592,324$1.9M$10,000
309590301Pearl River Widen & Overlay approximately 2 miles of SR 26 from the east end of the Pearl River Bridge to the east bridge abutment of the White Sands Bridge1#1 Huey P. Stockstill, LLC: $5.2M$5.2M$5.2MNot available
309591301Stone Mill & Overlay approximately 3.87 miles of SR 149 from US 49S to US 49N2#1 Warren Paving, Inc.: $2.0M; #2 Huey P. Stockstill, LLC: $2.0M$2.0M$3.9M$15,377