Letting results · Mississippi Department of Transportation
June 5, 2026 letting results
Fast-published project results from the freshest available state snapshot.
10trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| 100222303 | Desoto Overlay approximately 0.3 miles of Stateline Road beginning just west of Northwest Drive and going easterly to just east of Hamilton Road | 1 | #1 Lehman - Roberts Company: $798,450 | $798,450 | $798,450 | Not available |
| 108212301 | Warren Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 Intersection to 0.36 miles North of SR 465 at Redwood | 1 | #1 APAC - Mississippi, Inc.: $12.0M | $12.0M | $12.0M | Not available |
| 108722301 | Covington Mill & Overlay approximately 9 miles of US | 3 | #1 APAC - Mississippi, Inc.: $3.6M; #2 Warren Paving, Inc.: $3.9M; #3 Dunn Roadbuilders, LLC: $3.9M | $3.6M | $11.4M | $304,923 |
| 108989301 | Walthall Overlay approximately 8 miles of SR 27 from the Louisiana State Line to High School Drive | 3 | #1 Barriere Construction Company, LLC: $3.6M; #2 Dunn Roadbuilders, LLC: $3.6M; #3 Dickerson & Bowen, Inc.: $3.9M | $3.6M | $11.1M | $10,174 |
| 109230301 | Yazoo Mill & Overlay approximately 3 miles of MS 16/149 from MS 3 to US | 1 | #1 APAC - Mississippi, Inc.: $2.6M | $2.6M | $2.6M | Not available |
| 109438301 | Marshall Overlay approximately 14.3 miles of MS Highway 7 beginning at the Lafayette County Line going northerly through the I-22 Interchange | 1 | #1 Lehman-Roberts Company: $7.0M | $7.0M | $7.0M | Not available |
| 110039301 | Marshall Bridge Repair on MS 311 over Little Coldwater River (Bridge No. 11.8) | 9 | #1 Ste-Bil Grading Inc.: $235,182; #2 Phillips Contracting Co., Inc.: $298,412; #3 Talbot Brothers Contracting Co., Inc.: $312,866; #4 M & N Excavators, Inc.: $335,523; #5 Hope Enterprises, LLC: $349,182; #6 Century Construction Group, Inc.: $424,211; #7 Key, LLC: $460,720; #8 Wilco, Inc.: $548,198; #9 J. M. Duncan, Inc.: $681,040 | $235,182 | $3.6M | $63,230 |
| 307878301 | Monroe Mill & Overlay approximately 9 miles of SR 25 from US 45A to US | 2 | #1 Falcon Contracting Company, Inc.: $4.4M; #2 APAC - Mississippi, Inc.: $4.7M | $4.4M | $9.1M | $342,541 |
| 308853301 | Wilkinson Mill & Overlay approximately 2 miles of SR 24 from Lower Woodville Road to US | 2 | #1 APAC - Mississippi, Inc.: $1.3M; #2 Dickerson & Bowen, Inc.: $1.3M | $1.3M | $2.6M | $82,886 |
| 309966301 | Benton Mill & Overlay approximately 10.1 miles of MS 178 from the Marshall County Line to the Union County | 3 | #1 WG Construction Company, Inc.: $6.1M; #2 Lehman-Roberts Company: $6.3M; #3 APAC - Mississippi, Inc.: $6.6M | $6.1M | $19.0M | $231,830 |
Back to the state market · How results are calculated
Last updated September 16, 2026 with source data through September 1, 2026. See the methodology and data dictionary or report a correction.