Letting results · Mississippi Department of Transportation
May 27, 2026 letting results
Fast-published project results from the freshest available state snapshot.
19trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| 102372302 | Leake Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR | 8 | #1 Joe McGee Construction Company, Inc.: $3.1M; #2 Cook & Son, LLC: $3.1M; #3 Chris Albritton Construction Company, Inc.: $3.4M; #4 Ste-Bil Grading Inc.: $3.5M; #5 Cotton Creek Transport, Inc.: $3.9M; #6 Hemphill Construction Company, Inc.: $4.1M; #7 Key, LLC: $4.5M; #8 N. L. Carson Construction Company, Inc.: $4.6M | $3.1M | $30.1M | $15,524 |
| 105530301 | Madison, Hinds & Yazoo Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITS Improvements on US 49 from Northside... | 4 | #1 APAC - Mississippi, Inc.: $18.6M; #2 Superior Asphalt, Inc.: $18.9M; #3 Dickerson & Bowen, Inc.: $19.3M; #4 A J Construction, Inc.: $20.6M | $18.6M | $77.3M | $254,022 |
| 108392301 | Harrison Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7 | 5 | #1 Holliday Construction, LLC: $2.4M; #2 Chris Albritton Construction Company, Inc.: $2.7M; #3 Hemphill Construction Company, Inc.: $2.9M; #4 T. L. Wallace Construction, Inc.: $3.2M; #5 JLB Contractors, LLC: $3.3M | $2.4M | $14.5M | $329,166 |
| 108781302 | Panola Bridge Preventive Maintenance on I-55 (Bridge Nos. 237.3A & 237.3B) over Hentz Road | 5 | #1 Century Construction Group, Inc.: $434,774; #2 Talbot Brothers Contracting Co., Inc.: $449,632; #3 Gibson & Associates, Inc.: $615,112; #4 Key, LLC: $710,994; #5 Ste-Bil Grading Inc.: $798,212 | $434,774 | $3.0M | $14,858 |
| 109403301 | & SP-0002-03(097) / 109005301 Noxubee Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay approximately 12 miles ... | 2 | #1 APAC - Mississippi, Inc.: $20.6M; #2 Falcon Contracting Company, Inc.: $20.7M | $20.6M | $41.3M | $50,781 |
| 109465301 | & SP-0022-01(094) / 109466301 Jones Overlay approximately 11. | 2 | #1 Dunn Roadbuilders, LLC: $4.3M; #2 Walters Construction Co., Inc.: $4.5M | $4.3M | $8.8M | $180,645 |
| 109467302 | & MP-6613-20(007) / 308310301 Jackson & George Widen & Overlay approximately 6. | 1 | #1 Warren Paving, Inc.: $7.0M | $7.0M | $7.0M | Not available |
| 109580301 | Franklin Restricted Crossing U-Turn (RCUT) on US 84 at MS | 2 | #1 Midway Construction, Inc.: $3.8M; #2 Simmons Erosion Control, Inc.: $4.3M | $3.8M | $8.1M | $574,535 |
| 109758301 | Prentiss Mill & Overlay approximately 7 miles of SR 4 from east of Church Street to west of the Junction with SR 371 at Hobo Station | 2 | #1 WG Construction Company, Inc.: $2.8M; #2 APAC - Mississippi, Inc.: $3.2M | $2.8M | $6.0M | $343,301 |
| 109767301 | Grenada Widening of US 51 from Glenwild to North Street | 2 | #1 Falcon Contracting Company, Inc.: $5.8M; #2 Lehman-Roberts Company: $5.9M | $5.8M | $11.7M | $117,634 |
| 109770302 | & SP-0023-02(068) / 109770301 Leake Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 miles of MS 35 from Pleasant Hill Road to MS | 4 | #1 Superior Asphalt, Inc.: $5.4M; #2 Dickerson & Bowen, Inc.: $5.6M; #3 Falcon Contracting Company, Inc.: $5.8M; #4 APAC - Mississippi, Inc.: $5.9M | $5.4M | $22.7M | $129,383 |
| 109879301 | Harrison Widening on I-10 at MS 605 WB Ramp | 3 | #1 Necaise Brothers Construction Co., Inc.: $1.4M; #2 Warren Paving, Inc.: $1.4M; #3 JLB Contractors, LLC: $1.4M | $1.4M | $4.3M | $6,749 |
| 109926301 | Hinds Installation of Center Line Rumble Strips on MS 18 from Old Port Gibson Road to the Copiah County Line | 1 | #1 Traffic Control Products Company, Inc.: $747,774 | $747,774 | $747,774 | Not available |
| 110008301 | Hinds Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to South of Edwards | 3 | #1 APAC - Mississippi, Inc.: $4.9M; #2 Dickerson & Bowen, Inc.: $5.0M; #3 A J Construction, Inc.: $6.0M | $4.9M | $15.9M | $128,129 |
| 110040301 | Desoto Bridge Repair on I-55 over Star Landing Road (Bridge Nos. 285.9A & 285.9B) | 7 | #1 Century Construction Group, Inc.: $609,353; #2 Key, LLC: $628,571; #3 Phillips Contracting Co., Inc.: $685,643; #4 Gibson & Associates, Inc.: $699,624; #5 Hemphill Construction Company, Inc.: $734,914; #6 Ste-Bil Grading Inc.: $829,525; #7 Talbot Brothers Contracting Co., Inc.: $918,583 | $609,353 | $5.1M | $19,219 |
| 307877301 | Itawamba Mill & Overlay 10 miles of SR 371 from the Mantachie Corp. limit to the Prentiss County Line | 3 | #1 APAC - Mississippi, Inc.: $4.1M; #2 WG Construction Company, Inc.: $4.1M; #3 Falcon Contracting Company, Inc.: $4.2M | $4.1M | $12.5M | $14,442 |
| 310038301 | Tishomingo Scrub Seal & Overlay approximately 12 miles of MS 172 from the junction of US 72 to the Junction of US | 2 | #1 WG Construction Company, Inc.: $4.2M; #2 APAC - Mississippi, Inc.: $4.3M | $4.2M | $8.5M | $61,638 |
| 310197301 | Neshoba Thin Lift Overlay of MS 16 from Thompson Drive to the Intersection of MS | 5 | #1 Dickerson & Bowen, Inc.: $2.6M; #2 Superior Asphalt, Inc.: $2.8M; #3 APAC - Mississippi, Inc.: $2.9M; #4 Walters Construction Co., Inc.: $3.0M; #5 Falcon Contracting Company, Inc.: $3.2M | $2.6M | $14.4M | $216,784 |
| 503808301 | Lee Building Improvements at District | 1 | #1 Flagstar Construction Company, Inc.: $852,600 | $852,600 | $852,600 | Not available |
Back to the state market · How results are calculated
Last updated September 16, 2026 with source data through September 1, 2026. See the methodology and data dictionary or report a correction.