| 108186301 | Humphreys Widen & Overlay approximately 10 miles of SR 149 from 0.3 Miles South of SR 14 to US 49W | 2 | #1 APAC - Mississippi, Inc.: $7.9M; #2 Cook & Son, LLC: $8.3M | $7.9M | $16.1M | $410,064 |
| 108246301 | Leake Mill & Overlay approximately 9.8 miles of SR 25 from Renfroe to the Attala County Line | 5 | #1 Superior Asphalt, Inc.: $10.4M; #2 Cook & Son, LLC: $10.5M; #3 Falcon Contracting Company, Inc.: $10.6M; #4 APAC - Mississippi, Inc.: $10.9M; #5 Dickerson & Bowen, Inc.: $11.0M | $10.4M | $53.4M | $34,890 |
| 108911301 | Winston Mill & Overlay approximately 9 miles of SR 397 from the Kemper County Line to Robertson Road | 4 | #1 APAC - Mississippi, Inc.: $2.9M; #2 Falcon Contracting Company, Inc.: $3.3M; #3 Cook & Son, LLC: $3.3M; #4 Superior Asphalt, Inc.: $3.3M | $2.9M | $12.8M | $327,761 |
| 109004301 | Marion Seal & Overlay approximately 8.5 miles of MS 44 from near Gates Road to the Lamar County Line | 3 | #1 Warren Paving, Inc.: $3.3M; #2 Southern Paving, LLC: $3.3M; #3 Dunn Roadbuilders, LLC: $3.7M | $3.3M | $10.3M | $1,842 |
| 109021301 | Copiah Overlay approximately 5.3 miles of SR 27 from 0.2 mile south of Old Highway 27 to 0.35 mile north of I-55 | 5 | #1 Southern Paving, LLC: $2.3M; #2 APAC - Mississippi, Inc.: $2.5M; #3 Dickerson & Bowen, Inc.: $2.5M; #4 Walters Construction Co., Inc.: $2.8M; #5 A J Construction, Inc.: $3.2M | $2.3M | $13.4M | $239,655 |
| 109687301 | & NHPP-0072-04(034) / 109689301 Washington & Sunflower Bridge Repair on US 61 over Deer Creek and US 49W over Lake Dawson on Bridge Nos. 179.1, 244.7A & 244.7B | 7 | #1 Century Construction Group, Inc.: $1.5M; #2 Talbot Brothers Contracting Co., Inc.: $1.5M; #3 Hope Enterprises, LLC: $1.5M; #4 Key, LLC: $1.6M; #5 Gibson & Associates, Inc.: $1.7M; #6 Southern Road & Bridge, LLC: $1.8M; #7 Gemstone, LLC: $1.9M | $1.5M | $11.5M | $20,950 |
| 109783301 | Lauderdale Mill & Overlay approximately 3.4 miles of SR 854 from SR 39 to the Naval Air Station | 3 | #1 APAC - Mississippi, Inc.: $3.1M; #2 Walters Construction Co., Inc.: $3.4M; #3 Superior Asphalt, Inc.: $4.2M | $3.1M | $10.7M | $261,569 |
| 109983301 | & SP-0035-01(010) / 109984301 Marshall Mill & Overlay approximately 4.2 miles of SR 311 from Landfill Road to Liles Road and approximately 3.5 miles from 0.1 mile south of Audie Todd Road to US | 4 | #1 Lehman-Roberts Company: $4.0M; #2 Double T Construction, LLC: $5.0M; #3 Falcon Contracting Company, Inc.: $5.5M; #4 Cook & Son, LLC: $5.7M | $4.0M | $20.1M | $997,807 |
| 110031301 | Tate Placement of Audible Stripe on MS 4 from MS 3 to Matthew Drive in Senatobia | 1 | #1 Riverside Traffic Systems, Inc.: $483,110 | $483,110 | $483,110 | Not available |
| 110032301 | Itawamba Install Center Audible Stripe, Replace Curve & Intersection Warning Signs, Refresh Striping & install Raised Pavement Markers on MS 23 from S... | 1 | #1 Riverside Traffic Systems, Inc.: $765,330 | $765,330 | $765,330 | Not available |
| 309962301 | Leake Mill & Overlay approximately 3 miles of MS 487 from east of Tuscolameta Big Canal to SR | 5 | #1 APAC - Mississippi, Inc.: $2.2M; #2 Dickerson & Bowen, Inc.: $2.2M; #3 Falcon Contracting Company, Inc.: $2.3M; #4 Cook & Son, LLC: $2.4M; #5 Superior Asphalt, Inc.: $2.4M | $2.2M | $11.6M | $60,360 |