Letting results · Mississippi Department of Transportation
October 28, 2025 letting results
Fast-published project results from the freshest available state snapshot.
13trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| 106110301 | Warren Bridge Replacement on SR 465 (Bridge No.15.7) 10/28/2025 3:43 PM Unofficial Document Page 3 of | 3 | #1 Century Construction Group, Inc.: $2.0M; #2 Ste-Bil Grading Inc.: $2.4M; #3 Gibson & Associates, Inc.: $2.7M | $2.0M | $7.1M | $378,597 |
| 109002301 | Smith Overlay approximately 6 miles on SR 28 from Mize to Taylorsville | 4 | #1 Southern Paving, LLC: $3.1M; #2 APAC - Mississippi, Inc.: $3.2M; #3 Walters Construction Co., Inc.: $3.5M; #4 Hayes General Construction, LLC: $3.6M | $3.1M | $13.4M | $165,670 |
| 109463301 | Forrest Mill, Level & Overlay approximately 4 miles of US 49 from US 11 to beginning of divided section at I-59 | 2 | #1 Warren Paving, Inc.: $5.4M; #2 Dunn Roadbuilders, LLC: $6.3M | $5.4M | $11.8M | $927,557 |
| 109667301 | Walthall Bridge Repair on US | 2 | #1 Key, LLC: $3.1M; #2 Hope Enterprises, LLC: $3.8M | $3.1M | $6.9M | $689,100 |
| 109668301 | Adams Bridge Repair on US 61 over St. Catherine Creek (Bridge Nos. 49.5A & 49.5B) | 3 | #1 Hemphill Construction Company, Inc.: $1.1M; #2 Key, LLC: $1.2M; #3 Hope Enterprises, LLC: $1.4M | $1.1M | $3.7M | $139,947 |
| 109673301 | Monroe Bridge Repair on US 278 over the Buttahatchie River (Bridge No. 21.6 | 4 | #1 Key, LLC: $756,956; #2 Phillips Contracting Co., Inc.: $848,688; #3 Gibson & Associates, Inc.: $876,957; #4 Century Construction Group, Inc.: $917,979 | $756,956 | $3.4M | $91,732 |
| 109679301 | Noxubee Bridge Repair on SR 145 over the Noxubee River Relief (Bridge No. 131.1) | 6 | #1 Hemphill Construction Company, Inc.: $1.3M; #2 Century Construction Group, Inc.: $1.3M; #3 Key, LLC: $1.3M; #4 Phillips Contracting Co., Inc.: $1.4M; #5 Gibson & Associates, Inc.: $1.8M; #6 Southern Road & Bridge, LLC: $1.8M | $1.3M | $8.9M | $53,299 |
| 109695301 | & NHPP-0006-01(108) / 109699301 Desoto & Marshall | 5 | #1 Gibson & Associates, Inc.: $6.0M; #2 Key, LLC: $6.1M; #3 Talbot Brothers Contracting Co., Inc.: $6.8M; #4 Century Construction Group, Inc.: $7.4M; #5 Southern Road & Bridge, LLC: $8.1M | $6.0M | $34.3M | $74,883 |
| 109730301 | & 109730301 Lowndes Bridge Repair on Old West Point Road over US 82 (Bridge No. 160.3) | 5 | #1 Key, LLC: $1.8M; #2 Gibson & Associates, Inc.: $6.0M; #3 Talbot Brothers Contracting Co., Inc.: $6.8M; #4 Century Construction Group, Inc.: $7.4M; #5 Southern Road & Bridge, LLC: $8.1M | $1.8M | $30.0M | $4.2M |
| 109971301 | Hinds Mill & Overlay approximately 6 miles on I-20 from Clinton to MS | 3 | #1 APAC - Mississippi, Inc.: $8.6M; #2 Dickerson & Bowen, Inc.: $9.4M; #3 Superior Asphalt, Inc.: $9.5M | $8.6M | $27.4M | $747,974 |
| 110032301 | Itawamba Install Center Audible Stripe, Replace Curve & Intersection Warning Signs, Refresh Striping & install Raised Pavement Markers on MS 23 from S... | 1 | #1 Riverside Traffic Systems, Inc.: $503,597 | $503,597 | $503,597 | Not available |
| 110033301 | & 110033302 Choctaw & Lowndes Audible Thermoplastic Pavement Markings, Thermoplastic Pavement Markings & Raised Pavement Markers beginning approximate... | 1 | #1 J. C. Cheek Contractors, Inc.: $418,290 | $418,290 | $418,290 | Not available |
| 110035301 | & 110035302 Holmes & Yazoo Placement of Audible Stripe on MS 433 from Yazoo County Line to Ebenezer-Coxburg Road in Benton and from Old Highway 16 to the Holmes County Line | 1 | #1 J. C. Cheek Contractors, Inc.: $426,229 | $426,229 | $426,229 | Not available |
Back to the state market · How results are calculated
Last updated September 16, 2026 with source data through August 25, 2026. See the methodology and data dictionary or report a correction.