Letting results · Mississippi Department of Transportation

October 22, 2024 letting results

Fast-published project results from the freshest available state snapshot.

17trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
107012301Holmes Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)4#1 Ste-Bil Grading Inc.: $2.7M; #2 Joe McGee Construction Company, Inc.: $2.9M; #3 Dozer, LLC: $4.3M; #4 Hemphill Construction Company, Inc.: $4.9M$2.7M$14.9M$229,081
107862301Pontotoc Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)4#1 Ste-Bil Grading Inc.: $4.8M; #2 Talbot Brothers Contracting Co., Inc.: $5.1M; #3 Cook & Son, LLC: $5.6M; #4 M & N Excavators, Inc.: $5.8M$4.8M$21.3M$257,886
108994301Franklin Microsurface approximately 14 miles of SR 33 from the Homochitto River to US 843#1 Vance Brothers, LLC: $1.8M; #2 T. L. Wallace Construction, Inc.: $2.1M; #3 Dickerson & Bowen, Inc.: $2.6M$1.8M$6.5M$225,044
109129301Forrest Safety Improvements along US 49 from WSF Tatum Blvd. to Sims Road2#1 T. L. Wallace Construction, Inc.: $2.1M; #2 Warren Paving, Inc.: $2.6M$2.1M$4.7M$439,882
109172301Hinds & Warren Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A, 17.7B, 17.9A & 17.9B)2#1 Key, LLC: $17.1M; #2 Freyssinet, Inc.: $17.3M$17.1M$34.4M$115,627
109195301Yazoo Construction of a Roundabout on SR 3 at Willie Morris Parkway1#1 Simmons Erosion Control, Inc.: $4.0M$4.0M$4.0MNot available
109251301Jones Remove and Replace OGFC on approximately 20 miles of I-59 from North of Rocky Creek to the Jasper County Line1#1 Dunn Roadbuilders, LLC: $10.3M$10.3M$10.3MNot available
109314301Intersection Improvements on various routes throughout the District1#1 Traffic Control Products Company, Inc.: $5.2M$5.2M$5.2MNot available
109316301Rankin Intersection Improvements on SR 25 at Mt. Helm Road and at Pisgah Road2#1 Hemphill Construction Company, Inc.: $2.7M; #2 Joe McGee Construction Company, Inc.: $3.5M$2.7M$6.2M$711,738
109359301Oktibbeha Safety Improvements on SR 25 at Longview Road2#1 Phillips Contracting Co., Inc.: $3.8M; #2 Ausbern Construction Company, Inc.: $4.9M$3.8M$8.7M$1.1M
109475301Lincoln & Pike Remove & Replace OGFC on approximately 9 miles of I-55 from US 98W to the bridge south of the Bouge Chitto Interchange1#1 Dickerson & Bowen, Inc.: $7.4M$7.4M$7.4MNot available
109542301Placement of Audible Stripe and Signing Improvements along SR 25 from 0.3 miles north of SR 8 to the SR 25 Bypass, known as Federal Aid Project No. HSIP-0040-01(038) / 109542301 in Monroe County.1#1 Riverside Traffic Systems, Inc.: $344,004$344,004$344,004Not available
502891301Building Improvements at the Clinton Maintenance Area Headquarters Office Building, HVAC Upgrades, known as State Project No. BWO-5222-25(003) / 502891301210 in Hinds County.4#1 Flagstar Construction Company, Inc.: $136,000; #2 TruMac, LLC: $325,458; #3 McLain Plumbing & Electrical Service, Inc.: $332,000; #4 Metro Mechanical, LLC IRREGULAR: $334,900$136,000$1.1M$189,458
503755301Hancock & Pearl River Renovation of Welcome Centers3#1 EOZ Build and Design, LLC: $343,818; #2 H & A Painting, LLC: $365,000; #3 Hopkins Construction and Maintenance, LLC: $367,045$343,818$1.1M$21,182
503755303Pike & Wilkinson Renovation of Welcome Center & Woodville Hospitality Station4#1 Flagstar Construction Company, Inc.: $219,000; #2 H & A Painting, LLC: $260,000; #3 Hopkins Construction and Maintenance, LLC: $271,367; #4 EOZ Build and Design, LLC: $332,978$219,000$1.1M$41,000
503757301Alcorn & Itawamba Renovation of Welcome Centers3#1 Flagstar Construction Company, Inc.: $337,000; #2 EOZ Build and Design, LLC: $338,078; #3 H & A Painting, LLC: $398,000$337,000$1.1M$1,078
503757303Coahoma & DeSoto Renovation of Delma Furniss Hospitality Station & Desoto Welcome Center4#1 EOZ Build and Design, LLC: $493,409; #2 Flagstar Construction Company, Inc.: $569,000; #3 TruMac, LLC: $586,300; #4 H & A Painting, LLC: $779,000$493,409$2.4M$75,591

Back to the state market · How results are calculated

Last updated November 1, 2026 with source data through October 27, 2026. See the methodology and data dictionary or report a correction.