Letting results · Louisiana Department of Transportation and Development
November 18, 2026 letting results
Fast-published project results from the freshest available state snapshot.
48trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| H.004957 | clearing and grubbing, grading, drainage structures, lime treatment, milling asphalt concrete, pavement patching, class ii base course, asphalt concrete pavement, portland cement concrete pavement, detour road, precast concrete piles, precast-prestressed concrete girder spans bridge, lighting, alternate aa1 class ii base course (4" & 6" thick), alternate aa2 class ii base course (10" thick), and related work. | 5 | #1 Denley Brown Contractors, LLC: $71.1M; #2 Barriere Construction Company, LLC: $70.9M; #3 Huey P Stockstill, LLC: $76.3M; #4 JB JAMES CONSTRUCTION LLC: $86.0M; #5 RNGD Construction LLC: $104.4M | $70.9M | $408.7M | $172,775 |
| H.004957.6 | LA 3241: I-12/LA 434 INTERCHANGE TO LA 36 CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, DETOUR ROAD, PRECAST CONCRETE PILES, PRECAST-PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, LIGHTING, ALTERNATE AA1 CLASS II BASE COURSE (4" & 6" THICK), ALTERNATE AA2 CLASS II BASE COURSE (10" THICK), AND RELATED WORK. | 5 | #1 Denley Brown Contractors, LLC: $71.1M; #2 Barriere Construction Company, LLC: $70.9M; #3 Huey P Stockstill, LLC: $76.3M; #4 JB JAMES CONSTRUCTION LLC: $86.0M; #5 RNGD Construction LLC: $104.4M | $70.9M | $408.7M | $172,775 |
| H.007208 | HARVEY BLVD EXT(PETERS RD-MANHATTAN) | 0 | Not available | Pending | Not available | Not available |
| H.007530 | concrete walk, curbs, and ramps; signalization, lighting, and related work. | 0 | Not available | Pending | Not available | Not available |
| H.011401 | grading, combination concrete curb and gutter, concrete drives, slab sodding, and related work | 4 | #1 Command Construction Industries LLC: $469,469; #2 GULF STATES SERVICES, LLC: $514,414; #3 La Contracting Enterprise LLC: $663,510; #4 21 Construction, L.L.C.: $764,902 | $469,469 | $2.4M | $44,945 |
| H.011401.6 | US 51: US 190 - LA 3234 ACCESS MANAGEMENT GRADING, COMBINATION CONCRETE CURB AND GUTTER, CONCRETE DRIVES, SLAB SODDING, AND RELATED WORK | 4 | #1 Command Construction Industries LLC: $469,469; #2 GULF STATES SERVICES, LLC: $514,414; #3 La Contracting Enterprise LLC: $663,510; #4 21 Construction, L.L.C.: $764,902 | $469,469 | $2.4M | $44,945 |
| H.014231 | clearing and grubbing, removal of bridges, grading, drainage structures, milling asphalt concrete, pavement patching, class ii base course, lime treatment, asphalt concrete pavement, precast concrete piles, concrete slab span bridges, and related work. | 8 | #1 Diamond B Construction Co., L.L.C.: $7.7M; #2 Elevate Heavy Civil Construction, LLC: $7.9M; #3 Chief Bridge & Concrete LLC: $8.3M; #4 MERRICK, LLC: $9.1M; #5 WL Bass Construction, Inc.: $9.7M; #6 Apeck Construction, LLC: $10.1M; #7 JB JAMES CONSTRUCTION LLC: $10.3M; #8 GILCHRIST CONSTRUCTION COMPANY, LLC: $11.8M | $7.7M | $74.9M | $173,828 |
| H.014231.6 | LA 153: TOPY CREEK RELIEF & DRAIN BRS CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK. | 8 | #1 Diamond B Construction Co., L.L.C.: $7.7M; #2 Elevate Heavy Civil Construction, LLC: $7.9M; #3 Chief Bridge & Concrete LLC: $8.3M; #4 MERRICK, LLC: $9.1M; #5 WL Bass Construction, Inc.: $9.7M; #6 Apeck Construction, LLC: $10.1M; #7 JB JAMES CONSTRUCTION LLC: $10.3M; #8 GILCHRIST CONSTRUCTION COMPANY, LLC: $11.8M | $7.7M | $74.9M | $173,828 |
| H.014235 | clearing and grubbing, removal of bridge, grading, class ii base course, asphalt concrete pavement, concrete slab span bridge, precast concrete piles, and related work. | 6 | #1 Matt L. Guinn Construction, LLC: $1.5M; #2 Matt L. Guinn Construction, LLC: $1.5M; #3 Elevate Heavy Civil Construction, LLC: $1.6M; #4 MERRICK, LLC: $1.8M; #5 SIEMA CONSTRUCTION, LLC: $1.9M; #6 Reliant Industrial Solutions L.L.C.: $2.0M | $1.5M | $10.2M | $30,914 |
| H.014235.6 | WEST RACCA RD OVER E GRAND MARAIS DITCH CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, PRECAST CONCRETE PILES, AND RELATED WORK. | 6 | #1 Matt L. Guinn Construction, LLC: $1.5M; #2 Matt L. Guinn Construction, LLC: $1.5M; #3 Elevate Heavy Civil Construction, LLC: $1.6M; #4 MERRICK, LLC: $1.8M; #5 SIEMA CONSTRUCTION, LLC: $1.9M; #6 Reliant Industrial Solutions L.L.C.: $2.0M | $1.5M | $10.2M | $30,914 |
| H.014264 | clearing and grubbing, removal of bridges, grading, drainage structures, pavement patching, class ii base course, lime treatment, asphalt concrete pavement, precast concrete piles, concrete slab span bridges, reinforced concrete box culverts, and related work. | 8 | #1 Diamond B Construction Co., L.L.C.: $13.6M; #2 Louisiana Bridge, Inc.: $13.8M; #3 MERRICK, LLC: $15.3M; #4 Denley Brown Contractors, LLC: $17.2M; #5 JB JAMES CONSTRUCTION LLC: $17.2M; #6 WL Bass Construction, Inc.: $17.3M; #7 BAKER PILE DRIVING AND SITE WORK LLC: $19.9M; #8 GILCHRIST CONSTRUCTION COMPANY, LLC: $21.2M | $13.6M | $135.6M | $269,767 |
| H.014264.6 | LA 556: BRIDGES NEAR CHOUDRANT CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK. | 8 | #1 Diamond B Construction Co., L.L.C.: $13.6M; #2 Louisiana Bridge, Inc.: $13.8M; #3 MERRICK, LLC: $15.3M; #4 Denley Brown Contractors, LLC: $17.2M; #5 JB JAMES CONSTRUCTION LLC: $17.2M; #6 WL Bass Construction, Inc.: $17.3M; #7 BAKER PILE DRIVING AND SITE WORK LLC: $19.9M; #8 GILCHRIST CONSTRUCTION COMPANY, LLC: $21.2M | $13.6M | $135.6M | $269,767 |
| H.014350 | grading, drainage structures, milling asphalt pavement, pavement patching, aggregate surface course, asphalt concrete overlay, reinforced paving mat for asphalt concrete overlay, and related work. | 3 | #1 Diamond B Construction Co., L.L.C.: $1.9M; #2 Amethyst Construction, Inc.: $2.2M; #3 D & J CONSTRUCTION CO., LLC: $2.8M | $1.9M | $6.9M | $306,505 |
| H.014350.6 | OLD NATCHITOCHES RD: THOMAS - STELLA GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, AGGREGATE SURFACE COURSE, ASPHALT CONCRETE OVERLAY, REINFORCED PAVING MAT FOR ASPHALT CONCRETE OVERLAY, AND RELATED WORK. | 3 | #1 Diamond B Construction Co., L.L.C.: $1.9M; #2 Amethyst Construction, Inc.: $2.2M; #3 D & J CONSTRUCTION CO., LLC: $2.8M | $1.9M | $6.9M | $306,505 |
| H.014470 | clearing and grubbing, drainage structures, grading, pavement patching, concrete walks & drives, and related work. | 5 | #1 Progressive Construction Co., LLC: $624,288; #2 SIEMA CONSTRUCTION, LLC: $633,203; #3 Impact Infrastructure, LLC: $659,595; #4 Descant's Excavating & Construction Services, LLC: $695,253; #5 Glenn Lege Construction LLC: $768,272 | $624,288 | $3.4M | $8,915 |
| H.014470.6 | E. PINE STREET SIDEWALKS CLEARING AND GRUBBING, DRAINAGE STRUCTURES, GRADING, PAVEMENT PATCHING, CONCRETE WALKS & DRIVES, AND RELATED WORK. | 5 | #1 Progressive Construction Co., LLC: $624,288; #2 SIEMA CONSTRUCTION, LLC: $633,203; #3 Impact Infrastructure, LLC: $659,595; #4 Descant's Excavating & Construction Services, LLC: $695,253; #5 Glenn Lege Construction LLC: $768,272 | $624,288 | $3.4M | $8,915 |
| H.014557 | drilled shaft foundations, roadway lighting, and related work. | 6 | #1 PREFERRED ELECTRIC INC.: $2.2M; #2 Diamond Electrical Co., Inc.: $2.3M; #3 Jack B. Harper Electrical LLC: $2.5M; #4 Fortis Infrastructure Partners LLC: $2.5M; #5 Grady Crawford Const. Co., Inc. of Baton Rouge: $2.6M; #6 OZARK TRAFFIC MANAGEMENT, LLC: $2.6M | $2.2M | $14.6M | $136,210 |
| H.014557.6 | I-49: JUDSON WALSH INTCHG LTG. (OPEL.) DRILLED SHAFT FOUNDATIONS, ROADWAY LIGHTING, AND RELATED WORK. | 6 | #1 PREFERRED ELECTRIC INC.: $2.2M; #2 Diamond Electrical Co., Inc.: $2.3M; #3 Jack B. Harper Electrical LLC: $2.5M; #4 Fortis Infrastructure Partners LLC: $2.5M; #5 Grady Crawford Const. Co., Inc. of Baton Rouge: $2.6M; #6 OZARK TRAFFIC MANAGEMENT, LLC: $2.6M | $2.2M | $14.6M | $136,210 |
| H.014767 | clearing and grubbing, grading, drainage structures, class ii base course, lime treatment, milling asphalt pavement, pavement patching, roadway reinforcing mesh, asphalt concrete overlay, traffic signalization, and related work. | 2 | #1 Glenn Lege Construction LLC: $3.9M; #2 Prairie Contractors LLC: $6.2M | $3.9M | $10.1M | $2.3M |
| H.014767.6 | LA 182 @ DUCHAMP INTERSECTION IMP. CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ROADWAY REINFORCING MESH, ASPHALT CONCRETE OVERLAY, TRAFFIC SIGNALIZATION, AND RELATED WORK. | 2 | #1 Glenn Lege Construction LLC: $3.9M; #2 Prairie Contractors LLC: $6.2M | $3.9M | $10.1M | $2.3M |
| H.014981 | clearing and grubbing, removal of timber bridge, grading, class ii base course, asphalt concrete pavement, cabled articulated concrete block mattress, precast concrete piles, precast-prestressed concrete girders, concrete girder span bridge, and related work | 4 | #1 Elevate Heavy Civil Construction, LLC: $2.8M; #2 WL Bass Construction, Inc.: $3.1M; #3 JB JAMES CONSTRUCTION LLC: $3.7M; #4 Chief Bridge & Concrete LLC: $4.4M | $2.8M | $14.0M | $324,042 |
| H.014981.6 | HOSSTON RIVER ROAD BRIDGE OVER KELLY BAYOU CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, CABLED ARTICULATED CONCRETE BLOCK MATTRESS, PRECAST CONCRETE PILES, PRECAST-PRESTRESSED CONCRETE GIRDERS, CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK | 4 | #1 Elevate Heavy Civil Construction, LLC: $2.8M; #2 WL Bass Construction, Inc.: $3.1M; #3 JB JAMES CONSTRUCTION LLC: $3.7M; #4 Chief Bridge & Concrete LLC: $4.4M | $2.8M | $14.0M | $324,042 |
| H.015245 | clearing and grubbing, grading, milling asphalt pavement, asphalt concrete pavement, pavement patching, signal radar vehicle detection system, and related work. | 2 | #1 Diamond B Construction Co., L.L.C.: $10.8M; #2 D & J CONSTRUCTION CO., LLC: $12.8M | $10.8M | $23.6M | $2.1M |
| H.015245.6 | LA 594: LA 15 - RUSSELL SAGE RD CLEARING AND GRUBBING, GRADING, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE PAVEMENT, PAVEMENT PATCHING, SIGNAL RADAR VEHICLE DETECTION SYSTEM, AND RELATED WORK. | 2 | #1 Diamond B Construction Co., L.L.C.: $10.8M; #2 D & J CONSTRUCTION CO., LLC: $12.8M | $10.8M | $23.6M | $2.1M |
| H.015282 | borrow, drainage structures, aggregate surface course, milling asphalt pavement, pavement patching, asphalt concrete overlay, and related work | 4 | #1 R.J. Daigle & Sons Contractors, Inc: $3.8M; #2 Barber Bros. Contracting Co., L.L.C: $4.0M; #3 Barriere Construction Company, LLC: $4.2M; #4 Madden Gulf Coast, LLC: $4.7M | $3.8M | $16.6M | $174,881 |
| H.015282.6 | LA 73: SPELLMAN RD - LA 621 BORROW, DRAINAGE STRUCTURES, AGGREGATE SURFACE COURSE, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK | 4 | #1 R.J. Daigle & Sons Contractors, Inc: $3.8M; #2 Barber Bros. Contracting Co., L.L.C: $4.0M; #3 Barriere Construction Company, LLC: $4.2M; #4 Madden Gulf Coast, LLC: $4.7M | $3.8M | $16.6M | $174,881 |
| H.015406 | clearing and grubbing, removal of concrete and timber pile bridge, grading, drainage structures, class ii base course, asphalt concrete pavement, precast concrete piles, concrete slab span bridge, and related work | 4 | #1 BAKER PILE DRIVING AND SITE WORK LLC: $1.2M; #2 Elevate Heavy Civil Construction, LLC: $1.2M; #3 Command Construction Industries LLC: $1.3M; #4 Coastal Contractors, LLC: $1.6M | $1.2M | $5.2M | $3,445 |
| H.015406.6 | LOCK NO. 3 ROAD BRIDGE CLEARING AND GRUBBING, REMOVAL OF CONCRETE AND TIMBER PILE BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK | 4 | #1 BAKER PILE DRIVING AND SITE WORK LLC: $1.2M; #2 Elevate Heavy Civil Construction, LLC: $1.2M; #3 Command Construction Industries LLC: $1.3M; #4 Coastal Contractors, LLC: $1.6M | $1.2M | $5.2M | $3,445 |
| H.015550 | PRIDE-BAYWOOD ROAD OVER MILL CREEK | 0 | Not available | Pending | Not available | Not available |
| H.015550.6-R1 | PRIDE-BAYWOOD ROAD OVER MILL CREEK REMOVAL OF CONCRETE BRIDGE, CLEARING AND GRUBBING, GRADING, LIME TREATMENT, CLASS II BASE COURSE, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK. | 9 | #1 BAKER PILE DRIVING AND SITE WORK LLC: $1.3M; #2 Elevate Heavy Civil Construction, LLC: $1.4M; #3 Diamond B Construction Co., L.L.C.: $1.4M; #4 Command Construction Industries LLC: $1.4M; #5 Buck Town Contractors & Co.: $1.4M; #6 SIEMA CONSTRUCTION, LLC: $1.5M; #7 Matt L. Guinn Construction, LLC: $1.7M; #8 Coastal Contractors, LLC: $1.8M; #9 JB JAMES CONSTRUCTION LLC: $1.8M | $1.3M | $13.7M | $69,167 |
| H.015949 | clearing and grubbing, grading, drainage structures, milling asphalt concrete, pavement patching, class ii base course, in-place cement stabilized base course, lime treatment, in-place cement treated subgrade, asphalt concrete overlay, bridge approach slab repairs, and related work. | 0 | Not available | Pending | Not available | Not available |
| H.015949.6-R1 | LA 335: E. JCT. LA 694 - LA 14 CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE OVERLAY, BRIDGE APPROACH SLAB REPAIRS, AND RELATED WORK. | 2 | #1 Glenn Lege Construction LLC: $6.1M; #2 Prairie Contractors LLC: $8.9M | $6.1M | $15.0M | $2.8M |
| H.016082 | bridge rehabilitation, additive alternate 1: switchboard rehabilitation, additive alternate 2: tower span metalwork paint, and related work. | 3 | #1 RNGD Construction LLC: $12.8M; #2 Southern Road & Bridge, LLC: $18.5M; #3 J. Star Enterprises, Inc.: $18.8M | $12.8M | $50.1M | $5.7M |
| H.016082.6 | ST. CLAUDE AVE. BRIDGE (HBI) BRIDGE REHABILITATION, ADDITIVE ALTERNATE 1: SWITCHBOARD REHABILITATION, ADDITIVE ALTERNATE 2: TOWER SPAN METALWORK PAINT, AND RELATED WORK. | 3 | #1 RNGD Construction LLC: $12.8M; #2 Southern Road & Bridge, LLC: $18.5M; #3 J. Star Enterprises, Inc.: $18.8M | $12.8M | $50.1M | $5.7M |
| H.016223 | LA 3127: LA 70 - ST. JAMES CANAL BRIDGE | 0 | Not available | Pending | Not available | Not available |
| H.016526 | clearing and grubbing, grading, drainage structures, and related work. | 5 | #1 JD's Rebar & Construction, Inc.: $165,132; #2 Descant's Excavating & Construction Services, LLC: $188,167; #3 BRUDD CONSTRUCTION CO., LLC: $230,234; #4 Impact Infrastructure, LLC: $267,211; #5 Progressive Construction Co., LLC: $299,849 | $165,132 | $1.2M | $23,036 |
| H.016526.6 | I-49: CROSS DRAIN REPAIR AT LM 7.05 CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, AND RELATED WORK. | 5 | #1 JD's Rebar & Construction, Inc.: $165,132; #2 Descant's Excavating & Construction Services, LLC: $188,167; #3 BRUDD CONSTRUCTION CO., LLC: $230,234; #4 Impact Infrastructure, LLC: $267,211; #5 Progressive Construction Co., LLC: $299,849 | $165,132 | $1.2M | $23,036 |
| H.016558 | milling asphalt pavement, pavement patching, drainage structures, asphalt concrete overlay, roadway reinforcing mesh (complete road system), reinforced paving mat for asphalt concrete overlay, and related work. | 0 | Not available | Pending | Not available | Not available |
| H.016558.6-R1 | LA 35: LAFAYETTE PARISH LINE - US 90 MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, DRAINAGE STRUCTURES, ASPHALT CONCRETE OVERLAY, ROADWAY REINFORCING MESH (COMPLETE ROAD SYSTEM), REINFORCED PAVING MAT FOR ASPHALT CONCRETE OVERLAY, AND RELATED WORK. | 4 | #1 Elliott Construction, LLC: $5.6M; #2 Glenn Lege Construction LLC: $6.2M; #3 Prairie Contractors LLC: $6.4M; #4 GILCHRIST CONSTRUCTION COMPANY, LLC: $8.4M | $5.6M | $26.6M | $580,655 |
| H.016563 | clearing and grubbing, drainage structures, borrow, milling asphalt pavement, pavement patching, asphalt concrete overlay, pavement widening, and related work | 2 | #1 Madden Contracting Co., LLC: $4.6M; #2 Diamond B Construction Co., L.L.C.: $5.8M | $4.6M | $10.4M | $1.2M |
| H.016563.6 | LA 151: CLAIBORNE P/L - LA 545 CLEARING AND GRUBBING, DRAINAGE STRUCTURES, BORROW, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, PAVEMENT WIDENING, AND RELATED WORK | 2 | #1 Madden Contracting Co., LLC: $4.6M; #2 Diamond B Construction Co., L.L.C.: $5.8M | $4.6M | $10.4M | $1.2M |
| H.016575 | grading, drainage structures, class ii base course, milling asphalt pavement, asphalt concrete pavement, and related work. | 3 | #1 T.L. CONSTRUCTION LLC: $495,713; #2 Apeck Construction, LLC: $530,344; #3 JD's Rebar & Construction, Inc.: $595,949 | $495,713 | $1.6M | $34,631 |
| H.016575.6 | US 171: LEFT TURN AT INDUSTRIAL PARK RD GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK. | 3 | #1 T.L. CONSTRUCTION LLC: $495,713; #2 Apeck Construction, LLC: $530,344; #3 JD's Rebar & Construction, Inc.: $595,949 | $495,713 | $1.6M | $34,631 |
| H.016582 | asphalt surface treatment, striping, and related work. | 2 | #1 Dreher Contracting, LLC: $557,812; #2 BRUDD CONSTRUCTION CO., LLC: $576,062 | $557,812 | $1.1M | $18,251 |
| H.016582.6 | LA 531: LA 792 - LA 532 ASPHALT SURFACE TREATMENT, STRIPING, AND RELATED WORK. | 2 | #1 Dreher Contracting, LLC: $557,812; #2 BRUDD CONSTRUCTION CO., LLC: $576,062 | $557,812 | $1.1M | $18,251 |
| H.016760 | drainage structures, concrete curb ramps, and related work | 2 | #1 JD's Rebar & Construction, Inc.: $395,777; #2 Impact Infrastructure, LLC: $438,787 | $395,777 | $834,564 | $43,010 |
| H.016760.6 | US 190: OPELOUSAS ADA RAMPS DRAINAGE STRUCTURES, CONCRETE CURB RAMPS, AND RELATED WORK | 2 | #1 JD's Rebar & Construction, Inc.: $395,777; #2 Impact Infrastructure, LLC: $438,787 | $395,777 | $834,564 | $43,010 |
| H.016797 | US 80 & US 167: REPAIRS | 0 | Not available | Pending | Not available | Not available |
Back to the state market · How results are calculated
Last updated November 22, 2026 with source data through November 18, 2026. See the methodology and data dictionary or report a correction.