Letting results · Louisiana Department of Transportation and Development
June 30, 2026 letting results
Fast-published project results from the freshest available state snapshot.
19trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| 109974301 | Lee Mill & Overlay approximately 6 miles of MS 348 from the Union County Line to just west of US | 5 | #1 APAC - Mississippi, Inc.: $2.5M; #2 Cook & Son, LLC: $2.8M; #3 Falcon Contracting Company, Inc.: $3.3M; #4 WG Construction Company, Inc.: $3.4M; #5 Lehman - Roberts Company: $3.5M | $2.5M | $15.5M | $292,835 |
| 309967301 | Carroll Thin Lift Overlay approximately 10.1 miles of MS 35 from | 3 | #1 Falcon Contracting Company, Inc.: $2.8M; #2 Lehman - Roberts Company: $2.9M; #3 APAC - Mississippi, Inc.: $2.7M | $2.7M | $8.4M | $105,635 |
| H.012873 | OLD US 80: LAS RR XING (WEBSTER) | 0 | Not available | Pending | Not available | Not available |
| H.014897 | THOMAS & LEISURE RD: IC RR XINGS (EBR) | 0 | Not available | Pending | Not available | Not available |
| H.015173 | LEGION ST: IC XING(ST JAMES) | 0 | Not available | Pending | Not available | Not available |
| H.015174 | REV SAMUEL JONES RD: IC XING(ST JAMES) | 0 | Not available | Pending | Not available | Not available |
| H.015389 | LA 157: LAS XING (BOSSIER) | 0 | Not available | Pending | Not available | Not available |
| H.015402 | RR SAFETY: DATA & INVENTORY (2024-2026) | 0 | Not available | Pending | Not available | Not available |
| H.015455 | clearing and grubbing, removal of bridge, grading, drainage structures, class ii base course, lime treatment, asphalt concrete pavement, precast concrete piles, concrete slab span bridge, and related work. | 4 | #1 Chief Bridge & Concrete LLC: $1.2M; #2 Louisiana Bridge, Inc.: $1.2M; #3 Matt L. Guinn Construction, LLC: $1.3M; #4 JB JAMES CONSTRUCTION LLC: $1.5M | $1.2M | $5.1M | $70,812 |
| H.015455.6 | SPRING CREEK ROAD OVER WAFER CREEK CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK. | 4 | #1 Chief Bridge & Concrete LLC: $1.2M; #2 Louisiana Bridge, Inc.: $1.2M; #3 Matt L. Guinn Construction, LLC: $1.3M; #4 JB JAMES CONSTRUCTION LLC: $1.5M | $1.2M | $5.1M | $70,812 |
| H.015491 | clearing and grubbing, removal of timber bridge, grading, lime treatment, class ii base course, asphalt concrete pavement, reinforced concrete box culverts, and related work. | 5 | #1 Empire Dirtworks LLC: $743,723; #2 Reliant Industrial Solutions L.L.C.: $761,732; #3 SIEMA CONSTRUCTION, LLC: $783,776; #4 BRUDD CONSTRUCTION CO., LLC: $820,239; #5 Matt L. Guinn Construction, LLC: $911,760 | $743,723 | $4.0M | $18,009 |
| H.015491.6 | BANKENS ROAD OVER BAYOU ARCENEAUX CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, LIME TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK. | 5 | #1 Empire Dirtworks LLC: $743,723; #2 Reliant Industrial Solutions L.L.C.: $761,732; #3 SIEMA CONSTRUCTION, LLC: $783,776; #4 BRUDD CONSTRUCTION CO., LLC: $820,239; #5 Matt L. Guinn Construction, LLC: $911,760 | $743,723 | $4.0M | $18,009 |
| H.015526 | electrical systems (pump station), intelligent transportation system signalization, and related work. | 2 | #1 Grady Crawford Const. Co., Inc. of Baton Rouge: $1.4M; #2 Jack B. Harper Electrical LLC: $1.6M | $1.4M | $3.0M | $179,731 |
| H.015526.6 | CHIPPEWA ST PUMP STATION IMP PHASE 1 ELECTRICAL SYSTEMS (PUMP STATION), INTELLIGENT TRANSPORTATION SYSTEM SIGNALIZATION, AND RELATED WORK. | 2 | #1 Grady Crawford Const. Co., Inc. of Baton Rouge: $1.4M; #2 Jack B. Harper Electrical LLC: $1.6M | $1.4M | $3.0M | $179,731 |
| H.015951 | DORCY & LACROIX: UP CROSSINGS(IBERVILLE) | 0 | Not available | Pending | Not available | Not available |
| H.016577 | LA 733 @ VINCENT ROAD ROUNDABOUT | 0 | Not available | Pending | Not available | Not available |
| H.016614 | LA 339: LA 92 - VINCENT RD | 0 | Not available | Pending | Not available | Not available |
| H.016662 | ALM: SEVERAL CROSSINGS IN DIST 05 | 0 | Not available | Pending | Not available | Not available |
| H.016728 | ALMONASTER AVE & JOURDAN RD: NOPB XINGS | 0 | Not available | Pending | Not available | Not available |
Back to the state market · How results are calculated
Last updated September 16, 2026 with source data through September 9, 2026. See the methodology and data dictionary or report a correction.