Letting results · Florida Department of Transportation

October 6, 2026 letting results

Fast-published project results from the freshest available state snapshot.

11trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
E50E9SEMINOLE County12#1 FAITH CONSTRUCTION GROUP, INC.: $546,375; #2 YOROCA ENGINEERING CONTRACTORS, LLC: $549,400; #3 BURNETT CIVIL CONTRACTING OF FL: $568,400; #4 MORHSE INFRASTUCTURE: $623,725; #5 TURTLE INFRASTRUCTURE PARTNERS, LLC: $707,050; #6 LAS CONTRACTING CORP: $820,000; #7 WRANGLER CONSTRUCTION INC.: $895,010; #8 AMERICAN DESIGN ENGINEERING CONSTRUCTION INC.: $897,900; #9 HIGHER GROUND LAND SERVICES, LL: $919,450; #10 FLORIDA MOT, CORP: $970,925; #11 CIVIL INDUSTRIES LLC: $1.2M; #12 ROGAR MANAGEMENT & CONSULTING OF FLORIDA LLC: $1.3M$546,375$10.0M$3,025
E52G7SUMTER County5#1 C.W. ROBERTS CONTRACTING, INC.: $1.5M; #2 RANGER CONSTRUCTION INDUSTRIES, INC.: $1.7M; #3 Superior Asphalt, Inc.: $1.7M; #4 R & D PAVING LLC: $2.0M; #5 ROGAR MANAGEMENT & CONSULTING OF FLORIDA LLC: $2.9M$1.5M$9.8M$219,299
E52G8VOLUSIA County5#1 C.W. ROBERTS CONTRACTING, INC.: $2.0M; #2 HALIFAX PAVING, INC.: $2.3M; #3 V.A. PAVING, INC.: $2.4M; #4 MASCI GENERAL CONTRACTORS, INC: $2.5M; #5 PREFERRED MATERIALS INC.: $2.5M$2.0M$11.7M$283,784
E52G9SEMINOLE County7#1 S & L MATERIALS, INC: $5.5M; #2 HUBBARD CONSTRUCTION COMPANY: $5.5M; #3 RANGER CONSTRUCTION INDUSTRIES, INC.: $5.7M; #4 MIDDLESEX PAVING, LLC: $5.8M; #5 C.W. ROBERTS CONTRACTING, INC.: $6.0M; #6 MASCI GENERAL CONTRACTORS, INC: $6.0M; #7 PREFERRED MATERIALS INC.: $6.6M$5.5M$40.9M$10,049
E54G2DIST/ST-WIDE County4#1 CHINCHOR ELECTRIC INC.: $1.3M; #2 SIGNAL TECHNOLOGY AND INSTALLATION CORP.: $1.6M; #3 AUM CONSTRUCTION INC.: $1.6M; #4 AMERICAN LIGHTING AND SIGNALIZATION, LLC.: $2.0M$1.3M$6.6M$357,769
E54G4DIST/ST-WIDE County4#1 CHINCHOR ELECTRIC INC.: $1.2M; #2 SIGNAL TECHNOLOGY AND INSTALLATION CORP.: $1.5M; #3 AUM CONSTRUCTION INC.: $1.5M; #4 TRAFFIC CONTROL DEVICES, LLC: $1.6M$1.2M$5.8M$306,364
E55E0DIST/ST-WIDE County6#1 AMERICAN WATER SEWER AND DRAIN,: $282,750; #2 FLOTECH ENVIRONMENTAL LLC: $360,251; #3 GPH SERVICES, LLC: $368,606; #4 MORHSE INFRASTUCTURE: $369,050; #5 ATLANTIC PIPE SERVICES, LLC: $535,625; #6 AMERICAN DESIGN ENGINEERING CONSTRUCTION INC.: $621,000$282,750$2.5M$77,501
E55E3DIST/ST-WIDE County8#1 USA SERVICES OF FLORIDA, LLC: $249,625; #2 ENVIROWASTE SERVICES GROUP, INC.: $253,625; #3 GPH SERVICES, LLC: $265,625; #4 ATLANTIC PIPE SERVICES, LLC: $304,800; #5 SUNSTATE ENVIRONMENTAL GROUP LL: $346,438; #6 FLOTECH ENVIRONMENTAL LLC: $351,380; #7 ENVIRONMENTAL LAND DEVELOPMENT: $398,175; #8 AMERICAN DESIGN ENGINEERING CONSTRUCTION INC.: $594,250$249,625$2.8M$4,000
E55E5LAKE County12#1 FAITH CONSTRUCTION GROUP, INC.: $554,500; #2 COLLINS LAND SERVICES, LLC: $576,125; #3 MORHSE INFRASTUCTURE: $594,275; #4 AMERICAN DESIGN ENGINEERING CONSTRUCTION INC.: $696,475; #5 ENVIRONMENTAL LAND DEVELOPMENT: $765,425; #6 TURTLE INFRASTRUCTURE PARTNERS, LLC: $882,700; #7 ROGAR MANAGEMENT & CONSULTING OF FLORIDA LLC: $921,815; #8 HIGHER GROUND LAND SERVICES, LL: $931,200; #9 WRANGLER CONSTRUCTION INC.: $1.0M; #10 MIDWESTERN CONSTRUCTION, INC: $1.3M; #11 ESTEP CONSTRUCTION, INC.: $1.3M; #12 CIVIL INDUSTRIES LLC: $1.9M$554,500$11.4M$21,625
E57D4ORANGE County12#1 ENVIRONMENTAL LAND DEVELOPMENT: $440,620; #2 TRAILS CLEARING SERVICE LLC: $455,000; #3 CATES TRACTOR SERVICE LLC: $464,930; #4 HIGHER GROUND LAND SERVICES, LL: $475,000; #5 FAITH CONSTRUCTION GROUP, INC.: $487,689; #6 COLLINS LAND SERVICES, LLC: $520,660; #7 MIDWESTERN CONSTRUCTION, INC: $550,292; #8 ESTEP CONSTRUCTION, INC.: $574,687; #9 ROGAR MANAGEMENT & CONSULTING OF FLORIDA LLC: $586,863; #10 CIVIL INDUSTRIES LLC: $643,600; #11 SIGNAL TECHNOLOGY AND INSTALLATION CORP.: $683,999; #12 AMERICAN DESIGN ENGINEERING CONSTRUCTION INC.: $685,580$440,620$6.6M$14,380
E59D4MARION County3#1 T & M LAWN-FENCE SERVICE INC: $866,895; #2 SUPERIOR LANDSCAPING & LAWN SE: $1.1M; #3 MIDWESTERN CONSTRUCTION, INC: $1.5M$866,895$3.5M$188,424

Back to the state market · How results are calculated

Last updated October 28, 2026 with source data through October 28, 2026. See the methodology and data dictionary or report a correction.