Letting results · Florida Department of Transportation
April 29, 2026 letting results
Fast-published project results from the freshest available state snapshot.
13trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| E59D5 | ORANGE County | 0 | Not available | Pending | Not available | Not available |
| T2809 | CAMP GRADE RD AND SR 51 OVER STEINHATCHEE RIVER BRIDGE AND.. | 3 | #1 ANDERSON COLUMBIA CO., INC.: $8.4M; #2 COMMERCIAL INDUSTRIAL CORP.: $13.2M; #3 SUPERIOR CONSTRUCTION COMPANY SOUTHEAST, LLC: $16.0M | $8.4M | $37.5M | $4.8M |
| T3919 | Minor Bridge Replacement — Walton County | 6 | #1 F & W CONSTRUCTION COMPANY, INC.: $1.7M; #2 ANDERSON COLUMBIA CO., INC.: $1.8M; #3 MURPHREE BRIDGE CORPORATION: $1.9M; #4 H. G. HARDERS & SON, INC.: $3.0M; #5 F & W CONSTRUCTION COMPANY, INC.: $1.7M; #6 H. G. HARDERS & SON, INC.: $3.0M | $1.7M | $12.9M | $0 |
| T3995 | Resurfacing — Jackson County | 2 | #1 ANDERSON COLUMBIA CO., INC.: $14.2M; #2 C.W. ROBERTS CONTRACTING, INC.: $17.1M | $14.2M | $31.3M | $2.9M |
| T3996 | SR 77 (MAIN ST) FROM S OF 5TH ST TO S OF SR 273 (GLENWOOD... | 5 | #1 AMERICAN SAND & X-CAVATION, INC. DBA: $1.4M; #2 C.W. ROBERTS CONTRACTING, INC.: $1.5M; #3 SOUTHEAST CONSTRUCTION COMPANY, LLC: $1.6M; #4 ANDERSON COLUMBIA CO., INC.: $1.6M; #5 AMERICAN SAND & X-CAVATION, INC. DBA AMERICAN SAND & ASPHALT PAVING: $1.4M | $1.4M | $7.6M | $0 |
| T3997 | Traffic Signal — Leon County | 4 | #1 INGRAM SIGNALIZATION, INC.: $964,114; #2 ROBERTS AND ROBERTS, INC.: $1.1M; #3 TRAFFIC CONTROL DEVICES, LLC: $1.1M; #4 BLACKTIP SERVICES INCORPORATED: $1.7M | $964,114 | $4.9M | $101,392 |
| T4723 | SR 5 (US 1) FROM PALMETTO PARK RD TO SR 850 (NORTHLAKE BLVD) | 5 | #1 WEEKLEY ASPHALT PAVING, INC.: $2.3M; #2 THE STOUT GROUP LLC: $2.5M; #3 WEST CONSTRUCTION, INC.: $2.7M; #4 FLORIDA ENGINEERING & DEVELOPMENT: $2.8M; #5 FLORIDA ENGINEERING & DEVELOPMENT CORP: $2.8M | $2.3M | $13.1M | $218,532 |
| T4738 | SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE.. | 8 | #1 OHLA USA INC: $16.0M; #2 C.W. ROBERTS CONTRACTING, INC.: $18.5M; #3 HALLEY ENGINEERING CONTRACTORS, INC.: $19.3M; #4 TIMOTHY ROSE CONTRACTING, INC.: $19.5M; #5 FLORIDA ENGINEERING & DEVELOPMENT: $20.7M; #6 ROADWAY CONSTRUCTION, LLC: $21.0M; #7 RANGER CONSTRUCTION INDUSTRIES, INC.: $21.4M; #8 FLORIDA ENGINEERING & DEVELOPMENT CORP: $20.7M | $16.0M | $157.1M | $2.5M |
| T5880 | Resurfacing — Volusia County | 3 | #1 HALIFAX PAVING, INC.: $10.1M; #2 MASCI GENERAL CONTRACTORS, INC: $10.4M; #3 C.W. ROBERTS CONTRACTING, INC.: $10.6M | $10.1M | $31.1M | $299,187 |
| T5881 | SR 5 (US 1) FROM SR 400 (BEVILLE RD) TO N OF FAIRVIEW AVE | 2 | #1 MASCI GENERAL CONTRACTORS, INC: $9.2M; #2 C.W. ROBERTS CONTRACTING, INC.: $9.5M | $9.2M | $18.7M | $241,049 |
| T7562 | SR 586 (CURLEW RD) AND SR 595 (US ALT 19 / BAYSHORE BLVD)... | 8 | #1 WATSON CIVIL CONSTRUCTION, INC.: $27.7M; #2 CONE & GRAHAM, INC.: $32.0M; #3 RUSSELL ENGINEERING, INC.: $32.6M; #4 NELSON, DAVID, CONSTRUCTION CO.: $32.9M; #5 DE MOYA CONTRACTING LLC: $34.7M; #6 CRISDEL GROUP, INC: $41.3M; #7 AJAX PAVING INDUSTRIES OF FLORIDA LLC: $54.9M; #8 CONE & GRAHAM, INC.: $32.0M | $27.7M | $288.1M | $4.3M |
| T7611 | SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST | 10 | #1 PREFERRED MATERIALS INC.: $10.3M; #2 HUBBARD CONSTRUCTION COMPANY: $10.7M; #3 C.W. ROBERTS CONTRACTING, INC.: $11.4M; #4 AJAX PAVING INDUSTRIES OF FLORIDA LLC: $11.8M; #5 BLACKTIP SERVICES INCORPORATED: $12.3M; #6 CONE & GRAHAM, INC.: $12.4M; #7 BURGESS CIVIL, LLC: $12.4M; #8 PCS CIVIL, LLC: $12.7M; #9 NELSON, DAVID, CONSTRUCTION CO.: $14.2M; #10 CONE & GRAHAM, INC.: $12.4M | $10.3M | $120.6M | $443,617 |
| T7615 | Traffic Signal / Electrical/ Resurfacing — Pinellas County | 4 | #1 PREFERRED MATERIALS INC.: $925,222; #2 BURGESS CIVIL, LLC: $1.0M; #3 BLACKTIP SERVICES INCORPORATED: $1.1M; #4 AJAX PAVING INDUSTRIES OF FLORIDA LLC: $1.2M | $925,222 | $4.2M | $87,856 |
Back to the state market · How results are calculated
Last updated September 16, 2026 with source data through September 16, 2026. See the methodology and data dictionary or report a correction.