Letting results · Alabama Department of Transportation
August 28, 2026 letting results
Fast-published project results from the freshest available state snapshot.
15trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| ATRP2-52-2024-263 | Roadway Improvements/Realignment (Grading, Draining, Pavement, Traffic Signs, Traffic Signals, and Traffic Stripe) on SR-3 (US-31) at Sparkman Street and Lane Road, to include Access Management and Traffic Signal Installation in Hartselle | 3 | #1 ROGERS GROUP, INC.: $1.2M; #2 GRAYSON CARTER & SON CONTRACTING, INC.: $1.2M; #3 GILLESPIE CONSTRUCTION, LLC: $1.3M | $1.2M | $3.7M | $61,453 |
| BR-I059(455) | Bridge Rehabilitation (Hydroblasting, Bridge Painting, Substructure Patching, Miscellaneous Steel Repairs, Navigation Light Replacement, and Guardrail Installation) on I-20/I-59 over the Black Warrior River southwest of Tuscaloosa | 3 | #1 IVS HYDRO, INC.: $10.4M; #2 Cekra, Inc.: $10.8M; #3 Gibson & Associates, Inc.: $10.8M | $10.4M | $32.0M | $394,680 |
| BR-I059(460) | Bridge Painting on I-20/I-59 over Jones Creek and Factory Creek northeast of Epes | 3 | #1 S & D Industrial Painting, Inc.: $1.1M; #2 International Rigging Group, LLC: $1.1M; #3 Seminole Equipment, Inc.: $1.2M | $1.1M | $3.5M | $29,480 |
| CRPNU-I059(466) | Roadway Safety Improvements (Highway Lighting Upgrades) on the I-20/I-59 Ramps at the Exit 89 Interchange (Mercedes Drive) and the Access Road in Vance | 3 | #1 INLINE, LLC: $449,978; #2 STONE ELECTRIC COMPANY, INC.: $513,386; #3 TEMPLE J ELECTRIC, LLC: $550,548 | $449,978 | $1.5M | $63,408 |
| DEMO-A219(958) | Micro-Milling, Resurfacing, and Traffic Stripe on CR-109 (Bynum-Leatherwood Road) from the junction of SR-202 to the intersection of Morrisville Road to include Intersection Improvements (Left and Right Turn Lanes) at Old Coldwater Road, Eulaton Gate Road, and Gate 8 Road | 3 | #1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $2.3M; #2 APAC-ALABAMA, INC.: $2.3M; #3 GILLESPIE CONSTRUCTION, LLC: $2.4M | $2.3M | $7.0M | $71,357 |
| DEMOF-RPF-NHF-PRF-A210(943) | Bridge Replacement and Approaches (Grading, Drainage, Pavement, Intelligent Traffic Systems (ITS), Traffic Signals, and Traffic Stripe) on SR-6 (US-82) (Woolsey Finnell Bridge) over the Black Warrior River in Tuscaloosa | 0 | Not available | Pending | Not available | Not available |
| HRRR-0426(250) | Roadway Safety Improvements (Guardrail and Guardrail End Anchor Installations) on CR-65 (Bulldog Bend Road) at a point approximately 0.410 mile northwest of the junction of Cahaba Hill Road (Site 1); on CR-44 (Three Creeks Road) at a point approximately 0.110 mile south of the junction of Yeager Road (Site 2); and on CR-44 (Three Creeks Road) at a point 0.240 mile southeast of the junction of Yeager Road (Site 3) | 2 | #1 ALABAMA GUARDRAIL, INC.: $60,768; #2 C & H Construction Services, LLC: $62,737 | $60,768 | $123,505 | $1,970 |
| HRRR-1126(250) | Roadway Safety Improvements (Guardrail and Guardrail End Anchor Installation) on CR-54 over a branch of Dry Creek (Site 1) and on CR-54 along the horizontal curve 0.250 mile south of the Shelby County Line (Site 2) | 2 | #1 ALABAMA GUARDRAIL, INC.: $59,958; #2 C & H Construction Services, LLC: $66,081 | $59,958 | $126,039 | $6,123 |
| HRRR-3626(250) | Roadway Safety Improvements (Guardrail and Guardrail End Anchor Installation) on CR-81 over Flat Rock Creek (Site 1); on CR-30 over Unnamed Creek 0.320 mile east of the intersection of CR-17 (Site 2); and on CR-88 over Jones Branch (Site 3) | 1 | #1 ALABAMA GUARDRAIL, INC.: $164,200 | $164,200 | $164,200 | Not available |
| HRRR-5526(250) | Roadway Safety Improvements (Slope Flattening to include Clearing and Grubbing) on CR-1101 at the Conecuh River (Site 1) and Olustee Creek (Site 2) | 3 | #1 GRADY RALLS & SONS, INC.: $582,413; #2 S. A. GRAHAM COMPANY, INC.: $599,107; #3 E. O. BYARS CONSTRUCTION, INC.: $726,522 | $582,413 | $1.9M | $16,694 |
| IM-HSIP-IMGR-I022(327) | Planing, Micro-Milling, Resurfacing, Guardrail Installation (Guardrail, Guardrail End Anchors, and Guardrail Steel Blockout Replacement), and Traffic Stripe on I-22 from a point 0.800 mile east of the Exit 65 Interchange to the CR-61 Overpass | 3 | #1 DUNN CONSTRUCTION COMPANY, INC.: $8.3M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $8.4M; #3 APAC-ALABAMA, INC.: $9.1M | $8.3M | $25.8M | $158,475 |
| IM-IMGR-I065(571) | Planing, Micro-Milling, Resurfacing, and Traffic Stripe to include Guardrail and Cable Guiderail Installation on I-65 from a point 0.560 mile south of the Exit 305 Interchange in Good Hope to the SR-74 (US-278) Overpass west of Cullman | 0 | Not available | Pending | Not available | Not available |
| IM-IMGR-I065(577) | Planing, Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on I- 65 from the Montgomery County Line to a point near the SR-14 Interchange (MP 181.317) | 2 | #1 APAC-ALABAMA, INC.: $8.4M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $9.0M | $8.4M | $17.4M | $589,310 |
| STPSU-3525(253) | Planing, Resurfacing, and Traffic Stripe on North Broadway Street from the junction of SR-12 (US-84) to the junction of Main Street in Ashford | 3 | #1 LEWIS INCORPORATED..: $367,883; #2 APAC-ALABAMA, INC.: $442,117; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $533,878 | $367,883 | $1.3M | $74,233 |
| STPSU-3526(251) | Planing, Resurfacing, and Traffic Stripe on Webb Road from the intersection of North Range Street to the intersection of SR-210 (US-431) in Dothan | 3 | #1 LEWIS INCORPORATED..: $364,381; #2 APAC-ALABAMA, INC.: $403,506; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $579,544 | $364,381 | $1.3M | $39,125 |
Back to the state market · How results are calculated
Last updated November 1, 2026 with source data through September 25, 2026. See the methodology and data dictionary or report a correction.