Letting results · Alabama Department of Transportation

February 27, 2026 letting results

Fast-published project results from the freshest available state snapshot.

23trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
ATRP2-47-2024-047PAVEMENT PRESERVATION TO ROADWAY APPROACHES ON CR-13, CR-55, CR-74, CR-68, AND CR-63 AT VARIOUS SITES AS1#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $1.3M$1.3M$1.3MNot available
CMAQ-3715(261)STREETSCAPE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, SIDEWALK INSTALLATION, TRAFFIC SIGNAL UPGRADES, AND5#1 GILLESPIE CONSTRUCTION, LLC: $3.3M; #2 BULLS CONSTRUCTION GROUP, LLC: $3.8M; #3 SOUTHEASTERN SEALCOATING, INC.: $4.3M; #4 TAYLOR & MIREE CONSTRUCTION, INC: $4.5M; #5 CB&A CONSTRUCTION, LLC.: $4.9M$3.3M$20.8M$481,690
CRPNU-I020(366)INTERSTATE LIGHTING INSTALLATION AND UPGRADES ON I-20 AT THE CR-207 (EXIT 165) INTERCHANGE EAST OF RIVERSIDE4#1 TEMPLE J ELECTRIC, LLC: $1.2M; #2 STONE & SONS ELECTRICAL CONTRACTORS, INC.: $1.5M; #3 STONE ELECTRIC COMPANY, INC.: $1.6M; #4 WILLIAMS POWER & SIGNAL, LLC: $1.6M$1.2M$5.9M$313,318
HSIP-0182(509)ROADWAY AND SAFETY IMPROVEMENTS (PEDESTRIAN AND BICYCLE UPGRADES/TRAFFIC SIGNALS AND TRAFFIC STRIPE) ON SR-2#1 PL RUSSELL LLC: $623,215; #2 MCELHENNEY CONSTRUCTION CO., LLC: $727,242$623,215$1.4M$104,027
IM-I059(454)ROADWAY SAFETY IMPROVEMENTS (TRAFFIC SIGN REPLACEMENT) ON I-59 FROM THE SR-77 INTERCHANGE (EXIT 181) TO THE1#1 Superior Traffic Control, LLC: $745,754$745,754$745,754Not available
LRSI-2325(250)Call 0143#1 H & L CONSTRUCTION, INC.: $182,172; #2 ALABAMA GUARDRAIL, INC.: $183,574; #3 C & H Construction Services, LLC: $205,273$182,172$571,019$1,402
NH-0012(597)PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM THE JUNCTION OF SR-167 IN ENTERPRISE TO THE DALE2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.7M; #2 APAC-ALABAMA, INC.: $2.0M$1.7M$3.6M$254,909
NH-0074(552), STPAA-HSIP-0009(595)MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-74 FROM SR-21 TO CEDARTOWN HWY (SITE 1) AND2#1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $3.4M; #2 APAC-ALABAMA, INC.: $4.1M$3.4M$7.5M$749,378
NH-FMGR-0021(588)PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-21 (US-231) FROM A POINT 0.280 MILE SOUTH OF THE JUNCTION OF JONES3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.7M; #2 APAC-ALABAMA, INC.: $2.8M; #3 ASPHALT CONTRACTORS, INC.: $2.9M$2.7M$8.4M$115,433
NH-FMGR-0024(518)MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-24 FROM THE INTERSECTION OF CR-832#1 ROGERS GROUP, INC.: $2.9M; #2 GRAYSON CARTER & SON CONTRACTING, INC.: $3.1M$2.9M$6.0M$148,971
NH-FMGR-HSIP-0001(653)PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE INTERSECTION OF1#1 EAST ALABAMA PAVING COMPANY, INC.: $5.1M$5.1M$5.1MNot available
NH-HSIP-0017(602)PLANING, RESURFACING, TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENT), AND TRAFFIC STRIPE ON SR-17 (US-45)2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.4M; #2 APAC-ALABAMA, INC.: $3.0M$2.4M$5.3M$632,097
NH-HSIP-FMGR-0013(647)SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-131#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $5.1M$5.1M$5.1MNot available
STPAA-0012(586)ROADWAY SAFETY IMPROVEMENTS (DRAINAGE IMPROVEMENTS) ON SR-12 (US-84) AT THE JUNCTION OF CR-502 EAST OF ELBA5#1 S. A. GRAHAM COMPANY, INC.: $579,353; #2 GRADY RALLS & SONS, INC.: $663,443; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $694,296; #4 PL RUSSELL LLC: $850,735; #5 GIBSON CONSTRUCTION SERVICES, LLC: $889,373$579,353$3.7M$84,090
STPAA-0041(531)PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-41 FROM THE FLORIDA STATE LINE TO THE JUNCTION OF SR-15 (US-29) IN2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.5M; #2 APAC-ALABAMA, INC.: $1.9M$1.5M$3.4M$426,422
STPAA-0075(546)MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-75 FROM THE JUNCTION OF GARY ROAD4#1 GRAYSON CARTER & SON CONTRACTING, INC.: $1.3M; #2 ROGERS GROUP, INC.: $1.4M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.7M; #4 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $1.8M$1.3M$6.3M$103,155
STPAA-0295(501)PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-295 FROM THE JUNCTION OF CR-18 (LOVE ROAD) TO THE JUNCTION OF2#1 APAC-ALABAMA, INC.: $1.5M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.1M$1.5M$3.5M$608,808
STPAA-HSIP-0010(571)MICRO-MILLING, RESURFACING, CENTERLINE SCORING, AND TRAFFIC STRIPE ON SR-10 FROM THE INTERSECTION OF SR-13 (US-2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.9M; #2 APAC-ALABAMA, INC.: $2.2M$1.9M$4.1M$307,265
STPAA-HSIP-0016(539)PLANING, RESURFACING, GUARDRAIL INSTALLATION (STEEL BLOCKOUT REPLACEMENT), AND TRAFFIC STRIPE ON SR-16 (US-90)2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.6M; #2 APAC-ALABAMA, INC.: $1.9M$1.6M$3.5M$317,299
STPAA-HSIP-FMGR-0025(571)PLANING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENT),3#1 DUNN CONSTRUCTION COMPANY, INC.: $2.0M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.1M; #3 APAC-ALABAMA, INC.: $2.5M$2.0M$6.6M$139,355
STPAA-HSIP-FMGR-0130(502)SAFETY WIDENING, RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND TRAFFIC STRIPE ON SR-130 FROM THE JUNCTION OF SR-2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.0M; #2 APAC-ALABAMA, INC.: $4.2M$4.0M$8.2M$165,609
STPMN-5126(250)PLANING, RESURFACING, AND TRAFIC STRIPE ON CR-22 (TROTMAN ROAD) FROM THE JUNCTION OF CR-39 (WOODLEY ROAD) TO3#1 APAC-ALABAMA, INC.: $509,326; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $529,575; #3 ASPHALT CONTRACTORS, INC.: $615,102$509,326$1.7M$20,249
STPNU-1625(250)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON CR-114 FROM A POINT 0.330 MILE NORTHEAST OF THE JUNCTION OF2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $581,686; #2 APAC-ALABAMA, INC.: $605,021$581,686$1.2M$23,336

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.