Letting results · Alabama Department of Transportation

September 26, 2025 letting results

Fast-published project results from the freshest available state snapshot.

19trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
AL-20250926039MAINTENANCE BRIDGE PAINTING ON SR-13 (US-43) OVER THE BLACK WARRIOR RIVER RELIEF BRIDGES AND ON SR-8 (US-80)3#1 Gulf Coast Contracting, LLC: $495,670; #2 SOUTHERN COATINGS OF TARPON SPRINGS, LLC: $562,820; #3 OMEGA COATINGS & CONSTRUCTION, LLC: $704,323$495,670$1.8M$67,150
BR-0014(552)BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE REMOVAL) ON SR-14 OVER THE SIPSEY RIVER3#1 MCINNIS CONSTRUCTION, LLC: $8.2M; #2 GFC CONSTRUCTION, INC.: $8.3M; #3 IKAROS, LLC: $8.4M$8.2M$24.9M$148,985
BR-0118(517)BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND TRAFFIC STRIPE) ON SR-118 OVER BOGUE CREEK IN SULLIGENT2#1 CARCEL & G. CONSTRUCTION, LLC: $5.7M; #2 GLASGOW CONSTRUCTION CO., INC.: $6.8M$5.7M$12.5M$1.1M
CMAQ-NR19(938)STREETSCAPE AND SIDEWALK ENHANCEMENTS TO INCLUDE ADA UPGRADE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN2#1 SOUTH DADE AIR CONDITIONING & REFRIGERATION,: $2.7M; #2 BULLS CONSTRUCTION GROUP, LLC: $2.8M$2.7M$5.4M$94,785
CRPBH-3715(263)ROADWAY IMPROVEMENTS ON 22ND STREET NORTH, 12TH AVENUE NORTH, 20TH STREET NORTH, AND FL SHUTTLESWORTH2#1 SOUTH DADE AIR CONDITIONING & REFRIGERATION,: $1.3M; #2 BULLS CONSTRUCTION GROUP, LLC: $1.5M$1.3M$2.7M$246,086
DEMO-A211(948)INTERCHANGE LIGHTING ON I-65 AT THE CR-222 (EXIT 305) INTERCHANGE IN GOOD HOPE4#1 TEMPLE J ELECTRIC, LLC: $688,407; #2 STONE ELECTRIC COMPANY, INC.: $781,095; #3 STONE & SONS ELECTRICAL CONTRACTORS, INC.: $808,080; #4 J. RANCK ELECTRIC, INC.: $827,784$688,407$3.1M$92,688
IM-I059(461)CLEARING ON I-20/I-59 FROM EXIT 76 INTERCHANGE (MP 75.800) TO THE JEFFERSON COUNTY LINE4#1 BULLS CONSTRUCTION GROUP, LLC: $2.7M; #2 DOMINION CONSTRUCTION COMPANY, INC.: $2.9M; #3 CARCEL & G. CONSTRUCTION, LLC: $3.2M; #4 OPTERRA SOLUTIONS, INC.: $3.3M$2.7M$12.1M$236,693
IM-IMGR-I020(370)MICRO-FINE MILLING, RESURFACE, GUARDRAIL, AND STRIPE ON I-20 FROM A POINT BEGINNING AT THE 6-LANE SECTION (MP2#1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $6.4M; #2 APAC-ALABAMA, INC.: $7.6M$6.4M$14.0M$1.1M
IM-IMGR-I059(459)RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON I-20/I-59 FROM A POINT SOUTH OF THE FAIRFIELD BOULEVARD3#1 DUNN CONSTRUCTION COMPANY, INC.: $1.5M; #2 APAC-ALABAMA, INC.: $1.7M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.8M$1.5M$5.0M$208,817
IM-IMGR-I459(319)MICRO-MILL, RESURFACE, GUARDRAIL, CONCRETE CLEAN, & STRIPE ON I-459 FROM THE SOUTH END OF THE BRIDGE OVER SR-3#1 APAC-ALABAMA, INC.: $5.5M; #2 DUNN CONSTRUCTION COMPANY, INC.: $5.7M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $6.2M$5.5M$17.5M$231,587
LRSI-3625(250)GUARDRAIL INSTALLATION ON CR-74 OVER JONES CREEK (SITE 1) AND ON CR-91 OVER LONG ISLAND CREEK (SITE 2)2#1 ALABAMA GUARDRAIL, INC.: $135,628; #2 C & H Construction Services, LLC: $178,844$135,628$314,472$43,216
STPAA-0014(565)DEMOLITION AND STRUCTURE REMOVAL ON SR-14 FROM A POINT 0.500 MILE WEST OF THE JUNCTION OF CR-3 (INGRAM ROAD)2#1 MCELHENNEY CONSTRUCTION CO., LLC: $162,620; #2 BULLS CONSTRUCTION GROUP, LLC: $175,340$162,620$337,960$12,720
STPMB-7533(601)ACCESS MANAGEMENT AND TRAFFIC SIGNAL UPGRADES ON DAUPHIN STREET FROM A POINT WEST OF THE I-65 INTERCHANGE3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $9.3M; #2 MCELHENNEY CONSTRUCTION CO., LLC: $10.8M; #3 APAC-ALABAMA, INC.: $11.1M$9.3M$31.2M$1.5M
STPMN-0124(252)RESURFACING AND TRAFFIC STRIPE ON CR-81 FROM THE JUNCTION OF CR-10 TO THE JUNCTION OF CR-6 NORTHWEST OF3#1 APAC-ALABAMA, INC.: $460,627; #2 ASPHALT CONTRACTORS, INC.: $464,136; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $488,347$460,627$1.4M$3,509
STPMN-2625(252)WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-74 (FITZPATRICK ROAD) FROM THE JUNCTION OF SR-143 TO THE3#1 ASPHALT CONTRACTORS, INC.: $352,461; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $406,321; #3 APAC-ALABAMA, INC.: $421,434$352,461$1.2M$53,860
STPPC-4125(250)RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-246/CR-298 (MULLIN ROAD) FROM THE JUNCTION OF CR-1#1 EAST ALABAMA PAVING COMPANY, INC.: $996,528$996,528$996,528Not available
STPSU-3524(252)RESURFACING AND TRAFFIC STRIPE ON OLD WEBB ROAD FROM THE WEST TOWN LIMITS OF WEBB TO THE JUNCTION OF SR-522#1 APAC-ALABAMA, INC.: $565,643; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $692,127$565,643$1.3M$126,483
STPSU-3525(250), STPSU-3525(251)WIDENING, RESURFACING, AND TRAFFIC STRIPE ON MURPHY MILL ROAD FROM SR-605 TO SR-53 AND ON NORTH CHEROKEE2#1 APAC-ALABAMA, INC.: $1.4M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.5M$1.4M$2.8M$72,670
STPSU-CRPTL-6321(252)RESURFACE, SIDEWALK INSTALL, AND INTERSECTION IMPROVEMENTS ON MAIN AVENUE FROM THE INTERSECTION OF 5TH4#1 GFC CONSTRUCTION, INC.: $6.6M; #2 DOMINION CONSTRUCTION COMPANY, INC.: $6.8M; #3 BULLS CONSTRUCTION GROUP, LLC: $7.8M; #4 JOHN PLOTT COMPANY, INC.: $8.2M$6.6M$29.3M$226,988

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.