ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
AL-20250829022RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD6#1 CHILTON CONTRACTORS, INC.: $18.9M; #2 CARCEL & G. CONSTRUCTION, LLC: $19.7M; #3 IKAROS, LLC: $21.7M; #4 RUSSO CORPORATION: $25.2M; #5 GFC CONSTRUCTION, INC.: $25.6M; #6 GILLESPIE CONSTRUCTION, LLC: $26.2M$18.9M$137.3M$764,596
AL-20250829025MAINTENANCE BRIDGE PAINTING ON SR-53 (US-231) AT MP 315.314 IN HUNTSVILLE AND ON I-759 (MP 1.005) AT THE EASTSIDE7#1 Cekra, Inc.: $420,000; #2 OMEGA COATINGS & CONSTRUCTION, LLC: $567,464; #3 Gulf Coast Contracting, LLC: $626,556; #4 Olympus Painting Contractors, Inc.: $869,590; #5 International Rigging Group, LLC: $876,797; #6 Elite Industrial Painting, Inc.: $937,643; #7 M & J CONSTRUCTION COMPANY OF PINELLAS: $1.1M$420,000$5.4M$147,464
HSIP-I065(565), HSIP-I065(566)CABLE GUIDERAIL INSTALLATION ON I-65 FROM MP 16.940 TO MP 23.000 NORTH OF MOBILE3#1 RMD HOLDINGS, INC.: $849,694; #2 C & H Construction Services, LLC: $920,295; #3 ALABAMA GUARDRAIL, INC.: $1.1M$849,694$2.9M$70,601
IM-I020(375)MICRO-FINE MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-20 FROM A POINT 0.500 MILE EAST OF THE KELLY CREEK ROAD4#1 DUNN CONSTRUCTION COMPANY, INC.: $12.5M; #2 APAC-ALABAMA, INC.: $12.8M; #3 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $13.1M; #4 WIREGRASS CONSTRUCTION COMPANY, INC.: $13.5M$12.5M$51.9M$214,345
IM-I459(324)DRAINAGE IMPROVEMENTS AND PIPE REHABILITATION ON I-459 FROM A POINT NEAR MP 19.280 TO A POINT NEAR MP 19.3945#1 SOUTHEASTERN SEALCOATING, INC.: $613,624; #2 DOMINION CONSTRUCTION COMPANY, INC.: $616,645; #3 GILLESPIE CONSTRUCTION, LLC: $637,033; #4 CARCEL & G. CONSTRUCTION, LLC: $786,642; #5 IKAROS, LLC: $850,000$613,624$3.5M$3,021
IM-IMGR-I020(371)PLANE, MICRO-MILL, RESURFACE, GUARDRAIL INSTALL, AND STRIPE ON THE I-20 ON AND OFF RAMPS AT EXITS 185, 188, 191, 199,2#1 APAC-ALABAMA, INC.: $1.7M; #2 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $1.8M$1.7M$3.5M$89,020
IM-IMGR-I085(387)PAVEMENT PRESERVATION (MICRO-MILL, RESURFACE, AND STRIPE) ON I-85 FROM THE ANN STREET INTERCHANGE TO SR-8 (US-2#1 APAC-ALABAMA, INC.: $3.9M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.0M$3.9M$7.8M$110,387
STPSU-2823(251)RESURFACING (G TREATMENT) AND TRAFFIC STRIPE ON PLEASANT VALLEY ROAD FROM SR-25 (US-411) TO SR-7 (US-11)2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.7M; #2 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $2.7M$2.7M$5.3M$4,216