Letting results · Alabama Department of Transportation

July 25, 2025 letting results

Fast-published project results from the freshest available state snapshot.

12trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
ATRP2-02-2022-171WIDEN, RESURFACE, TURN LANE ADDITION, AND STRIPE ON SR-16 (US-90) FROM A POINT NEAR MT AID BAPTIST CHURCH TO THE5#1 PL RUSSELL LLC: $2.5M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.5M; #3 APAC-ALABAMA, INC.: $2.7M; #4 ARRINGTON CURB & EXCAVATION, INC.: $2.8M; #5 MCELHENNEY CONSTRUCTION CO., LLC: $2.9M$2.5M$13.4M$13,426
ATRP2-63-2023-499INTERSECTION IMPROVEMENTS AND ADDITIONAL THRU LANES ON I-20/I-59 AT THE DAIMLER BENZ BOULEVARD INTERCHANGE4#1 IKAROS, LLC: $2.3M; #2 APAC-ALABAMA, INC.: $2.6M; #3 Cornerstone Civil Contractors, LLC: $2.8M; #4 BULLS CONSTRUCTION GROUP, LLC: $2.9M$2.3M$10.6M$289,202
BR-0012(585)BRIDGE DECK REHABILITATION (HYDRO DEMO) AND PAINTING ON SR-12 (US-84) (EASTBOUND ROADWAY) OVER THE4#1 COMANCHE CONSTRUCTION OF GEORGIA, LLC: $897,368; #2 American Contracting & Services, Inc.: $1.1M; #3 Gibson & Associates, Inc.: $1.1M; #4 OMEGA COATINGS & CONSTRUCTION, LLC: $1.1M$897,368$4.2M$163,203
DEMO-NH-0035(523)ADDITIONAL LANES (GRADE, DRAIN, PAVE, SIGNALS, AND STRIPE) ON SR-35 FROM THE JUNCTION CR-62 (WILLIAM STREET) TO A4#1 ROGERS GROUP, INC.: $9.6M; #2 LAMBERT CONTRACTING, LLC: $10.0M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $10.4M; #4 GILLESPIE CONSTRUCTION, LLC: $13.6M$9.6M$43.6M$367,630
HSIP-0012(584)ACCESS MANAGEMENT (GRADE, DRAIN, PAVE, SIGNALS, & STRIPE) ON SR-12 (US-84) FROM CR-709 (MP 184.300) EAST OF3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.4M; #2 APAC-ALABAMA, INC.: $2.5M; #3 MCELHENNEY CONSTRUCTION CO., LLC: $2.8M$2.4M$7.7M$44,076
HSIP-0020(537)REDUCED CONFLICT INTERSECTION IMPROVEMENTS ON SR-20 AT CR-77 (GARGIS LANE) SOUTHEAST OF MUSCLE SHOALS4#1 ROGERS GROUP, INC.: $578,374; #2 GRAYSON CARTER & SON CONTRACTING, INC.: $780,797; #3 GILLESPIE CONSTRUCTION, LLC: $984,023; #4 MLMD, LLC: $987,182$578,374$3.3M$202,423
IM-I022(321)MICRO-FINE MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-22 FROM THE MARION COUNTY LINE TO THE CR-1 OVERPASS1#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.5M$1.5M$1.5MNot available
IM-I085(386)TRAFFIC SIGN UPGRADES ON I-85 (MAINLINE AND RAMPS) FROM THE LEE COUNTY LINE TO THE GEORGIA STATE LINE1#1 Superior Traffic Control, LLC: $277,987$277,987$277,987Not available
IM-IMGR-I085(389), IM-IMGR-I085(388), IM-PAVEMENT PRESERVATION, BRIDGE RAIL RETROFIT, AND STRIPE ON I-85 FROM 0.007 MILE SOUTH OF THE EXIT 22 INTERCHANGE2#1 APAC-ALABAMA, INC.: $19.3M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $20.6M$19.3M$39.9M$1.3M
RP-STPAA-MR22(902), NH-MR22(903)TRAFFIC SIGNAL AND OPERATIONS EQUIPMENT INSTALLATION ON SR-1, SR-25, SR-77, SR-291, SR-759, I-59, AND I-7592#1 STANSELL ELECTRIC CO., INC.: $12.1M; #2 INLINE, LLC: $12.5M$12.1M$24.6M$372,225
STPBHF-STPAAF-7026(601)INTERCHANGE MODIFICATIONS ON SR-149 (LAKESHORE PARKWAY) AT THE I-65 INTERCHANGE IN HOMEWOOD7#1 GILLESPIE CONSTRUCTION, LLC: $23.4M; #2 CARCEL & G. CONSTRUCTION, LLC: $25.1M; #3 WRIGHT BROTHERS CONSTRUCTION COMPANY, INC.: $25.3M; #4 RUSSO CORPORATION: $25.3M; #5 DUNN CONSTRUCTION COMPANY, INC.: $25.4M; #6 APAC-ALABAMA, INC.: $27.0M; #7 WIREGRASS CONSTRUCTION COMPANY, INC.: $27.4M$23.4M$179.0M$1.7M
STPSU-5220(251)BRIDGE CULVERT REPLACEMENT AND APPROACHES ON WEST MORGAN ROAD OVER BAKERS CREEK SOUTHWEST OF DECATUR6#1 ROGERS GROUP, INC.: $1.2M; #2 GRAYSON CARTER & SON CONTRACTING, INC.: $1.3M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.5M; #4 CARCEL & G. CONSTRUCTION, LLC: $1.5M; #5 GLASGOW CONSTRUCTION CO., INC.: $1.5M; #6 GILLESPIE CONSTRUCTION, LLC: $1.8M$1.2M$8.8M$48,650

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.