Letting results · Alabama Department of Transportation

April 26, 2024 letting results

Fast-published project results from the freshest available state snapshot.

17trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
HRRR-5523(250)SAFETY IMPROVEMENTS (SHOULDER WIDEN, FLATTEN SLOPES, STRIPE) ON CR-7707 FROM THE JUNCTION OF CR-7718 TO THE2#1 APAC-ALABAMA, INC.: $485,099; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $497,943$485,099$983,042$12,845
IM-I022(319)PAVEMENT PRESERVATION ON I-22 FROM THE COALBURG ROAD INTERCHANGE TO THE I-65 INTERCHANGE IN BIRMINGHAM3#1 APAC-ALABAMA, INC.: $2.1M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.1M; #3 DUNN CONSTRUCTION COMPANY, INC.: $2.2M$2.1M$6.5M$12,540
IM-I065(538)PAVEMENT PRESERVATION AND TRAFFIC STRIPE ON I-65 FROM A POINT NEAR THE SR-3 (US-31) OVERPASS (MP 186.417) TO A2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.0M; #2 APAC-ALABAMA, INC.: $2.2M$2.0M$4.1M$165,852
IM-I065(544)PAVEMENT PRESERVATION, GUARDRAIL INSTALLATION, AND STRIPE ON I-65 FROM A POINT NEAR THE SR-14 UNDERPASS (MP2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.7M; #2 APAC-ALABAMA, INC.: $5.3M$4.7M$10.0M$629,818
IM-I085(382)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-85 FROM A POINT SOUTH OF EXIT 57 (MP 56.720) TO A POINT NORTH1#1 EAST ALABAMA PAVING COMPANY, INC.: $5.3M$5.3M$5.3MNot available
NH-FMGR-0001(631)RESURFACING (MICRO-SURFACING SEAL COAT, TYPE II) AND STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF OLD SEALE3#1 ASPHALT PAVING SYSTEMS INC: $2.3M; #2 WHITAKER CONTRACTING CORPORATION: $2.7M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.1M$2.3M$8.2M$354,978
NH-FMGR-0007(562)RESURFACE (MICRO-SURFACING ), GUARDRAIL INSTALL, AND STRIPE ON SR-7 (US-11) FROM THE INTERSECTION OF SR-75 IN3#1 ASPHALT PAVING SYSTEMS INC: $895,692; #2 WHITAKER CONTRACTING CORPORATION: $970,018; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.2M$895,692$3.0M$74,325
STPAA-0003(654), STPAA-0003(655), STPAA-MICRO-MILL, RESURFACING (SCRUB SEAL), GUARDRAIL, AND STRIPE ON SR-3 (US-31) FROM THE JUNCTION OF 7TH AVENUE IN2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.4M; #2 DUNN CONSTRUCTION COMPANY, INC.: $5.5M$5.4M$11.0M$107,577
STPAA-0134(513)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-134 FROM THE JUNCTION OF CR-67 IN MIDLAND CITY TO THE3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.4M; #2 APAC-ALABAMA, INC.: $1.5M; #3 LEWIS INCORPORATED..: $1.5M$1.4M$4.4M$12,665
STPAA-0179(504)MICRO-MILL, RESURFACE (SCRUB SEAL), GUARDRAIL, AND STRIPE ON SR-179 FROM THE JUNCTION OF SR-74 (US-278) TO THE3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.2M; #2 WHITAKER CONTRACTING CORPORATION: $3.3M; #3 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $3.5M$3.2M$10.0M$47,681
STPAA-0185(505)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-185 FROM THE JUNCTION OF SR-3 (US-31) TO THE SOUTH END OF1#1 APAC-ALABAMA, INC.: $1.5M$1.5M$1.5MNot available
STPAA-FMGR-0060(501)RESURFACING, GUARDRAIL RESET, AND TRAFFIC STRIPE ON SR-60 FROM THE JUNCTION OF SR-14 IN WEDGEWORTH TO THE3#1 ASPHALT PAVING SYSTEMS INC: $1.6M; #2 WHITAKER CONTRACTING CORPORATION: $1.9M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.9M$1.6M$5.4M$263,199
STPAA-HSIP-0018(514)SAFETY WIDEN, MICRO-MILL, PLANING, RESURFACING, AND STRIPE ON SR-18 FROM THE MISSISSIPPI STATE LINE TO 0.250 MILE1#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $3.7M$3.7M$3.7MNot available
STPAA-HSIP-0027(519)SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-27 FROM THE INTERSECTION OF SR-1 (US-431) TO THE2#1 APAC-ALABAMA, INC.: $1.3M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.7M$1.3M$2.9M$376,282
STPAA-HSIP-0162(505)SAFETY WIDEN, RESURFACE, CULVERT, GUARDRAIL, AND STRIPE ON SR-162 FROM A POINT 0.250 MILE WEST OF DIXON CREEK1#1 ASPHALT CONTRACTORS, INC.: $1.6M$1.6M$1.6MNot available
STPMN-0115(252)ROADWAY IMPROVEMENTS (WIDEN, TURN LANE, RESURFACE, & STRIPE) ON FAIRFIELD AVENUE FROM THE JUNCTION OF SR-35#1 SOUTH DADE AIR CONDITIONING & REFRIGERATION,: $5.3M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.9M; #3 DUBOSE CONSTRUCTION COMPANY, LLC: $6.2M; #4 MCELHENNEY CONSTRUCTION CO., LLC: $6.6M; #5 BULLS CONSTRUCTION GROUP, LLC: $6.8M$5.3M$30.7M$636,879
STPPC-4123(252)RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-240 FROM A POINT NEAR THE HOSPILIKA CREEK BRIDGE2#1 D & J ENTERPRISES, INC.: $1.1M; #2 EAST ALABAMA PAVING COMPANY, INC.: $1.2M$1.1M$2.3M$34,286

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.