Letting results · Alabama Department of Transportation
April 26, 2024 letting results
Fast-published project results from the freshest available state snapshot.
17trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| HRRR-5523(250) | SAFETY IMPROVEMENTS (SHOULDER WIDEN, FLATTEN SLOPES, STRIPE) ON CR-7707 FROM THE JUNCTION OF CR-7718 TO THE | 2 | #1 APAC-ALABAMA, INC.: $485,099; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $497,943 | $485,099 | $983,042 | $12,845 |
| IM-I022(319) | PAVEMENT PRESERVATION ON I-22 FROM THE COALBURG ROAD INTERCHANGE TO THE I-65 INTERCHANGE IN BIRMINGHAM | 3 | #1 APAC-ALABAMA, INC.: $2.1M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.1M; #3 DUNN CONSTRUCTION COMPANY, INC.: $2.2M | $2.1M | $6.5M | $12,540 |
| IM-I065(538) | PAVEMENT PRESERVATION AND TRAFFIC STRIPE ON I-65 FROM A POINT NEAR THE SR-3 (US-31) OVERPASS (MP 186.417) TO A | 2 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.0M; #2 APAC-ALABAMA, INC.: $2.2M | $2.0M | $4.1M | $165,852 |
| IM-I065(544) | PAVEMENT PRESERVATION, GUARDRAIL INSTALLATION, AND STRIPE ON I-65 FROM A POINT NEAR THE SR-14 UNDERPASS (MP | 2 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.7M; #2 APAC-ALABAMA, INC.: $5.3M | $4.7M | $10.0M | $629,818 |
| IM-I085(382) | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-85 FROM A POINT SOUTH OF EXIT 57 (MP 56.720) TO A POINT NORTH | 1 | #1 EAST ALABAMA PAVING COMPANY, INC.: $5.3M | $5.3M | $5.3M | Not available |
| NH-FMGR-0001(631) | RESURFACING (MICRO-SURFACING SEAL COAT, TYPE II) AND STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF OLD SEALE | 3 | #1 ASPHALT PAVING SYSTEMS INC: $2.3M; #2 WHITAKER CONTRACTING CORPORATION: $2.7M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.1M | $2.3M | $8.2M | $354,978 |
| NH-FMGR-0007(562) | RESURFACE (MICRO-SURFACING ), GUARDRAIL INSTALL, AND STRIPE ON SR-7 (US-11) FROM THE INTERSECTION OF SR-75 IN | 3 | #1 ASPHALT PAVING SYSTEMS INC: $895,692; #2 WHITAKER CONTRACTING CORPORATION: $970,018; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.2M | $895,692 | $3.0M | $74,325 |
| STPAA-0003(654), STPAA-0003(655), STPAA- | MICRO-MILL, RESURFACING (SCRUB SEAL), GUARDRAIL, AND STRIPE ON SR-3 (US-31) FROM THE JUNCTION OF 7TH AVENUE IN | 2 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.4M; #2 DUNN CONSTRUCTION COMPANY, INC.: $5.5M | $5.4M | $11.0M | $107,577 |
| STPAA-0134(513) | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-134 FROM THE JUNCTION OF CR-67 IN MIDLAND CITY TO THE | 3 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.4M; #2 APAC-ALABAMA, INC.: $1.5M; #3 LEWIS INCORPORATED..: $1.5M | $1.4M | $4.4M | $12,665 |
| STPAA-0179(504) | MICRO-MILL, RESURFACE (SCRUB SEAL), GUARDRAIL, AND STRIPE ON SR-179 FROM THE JUNCTION OF SR-74 (US-278) TO THE | 3 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.2M; #2 WHITAKER CONTRACTING CORPORATION: $3.3M; #3 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $3.5M | $3.2M | $10.0M | $47,681 |
| STPAA-0185(505) | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-185 FROM THE JUNCTION OF SR-3 (US-31) TO THE SOUTH END OF | 1 | #1 APAC-ALABAMA, INC.: $1.5M | $1.5M | $1.5M | Not available |
| STPAA-FMGR-0060(501) | RESURFACING, GUARDRAIL RESET, AND TRAFFIC STRIPE ON SR-60 FROM THE JUNCTION OF SR-14 IN WEDGEWORTH TO THE | 3 | #1 ASPHALT PAVING SYSTEMS INC: $1.6M; #2 WHITAKER CONTRACTING CORPORATION: $1.9M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.9M | $1.6M | $5.4M | $263,199 |
| STPAA-HSIP-0018(514) | SAFETY WIDEN, MICRO-MILL, PLANING, RESURFACING, AND STRIPE ON SR-18 FROM THE MISSISSIPPI STATE LINE TO 0.250 MILE | 1 | #1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $3.7M | $3.7M | $3.7M | Not available |
| STPAA-HSIP-0027(519) | SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-27 FROM THE INTERSECTION OF SR-1 (US-431) TO THE | 2 | #1 APAC-ALABAMA, INC.: $1.3M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.7M | $1.3M | $2.9M | $376,282 |
| STPAA-HSIP-0162(505) | SAFETY WIDEN, RESURFACE, CULVERT, GUARDRAIL, AND STRIPE ON SR-162 FROM A POINT 0.250 MILE WEST OF DIXON CREEK | 1 | #1 ASPHALT CONTRACTORS, INC.: $1.6M | $1.6M | $1.6M | Not available |
| STPMN-0115(252) | ROADWAY IMPROVEMENTS (WIDEN, TURN LANE, RESURFACE, & STRIPE) ON FAIRFIELD AVENUE FROM THE JUNCTION OF SR-3 | 5 | #1 SOUTH DADE AIR CONDITIONING & REFRIGERATION,: $5.3M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.9M; #3 DUBOSE CONSTRUCTION COMPANY, LLC: $6.2M; #4 MCELHENNEY CONSTRUCTION CO., LLC: $6.6M; #5 BULLS CONSTRUCTION GROUP, LLC: $6.8M | $5.3M | $30.7M | $636,879 |
| STPPC-4123(252) | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-240 FROM A POINT NEAR THE HOSPILIKA CREEK BRIDGE | 2 | #1 D & J ENTERPRISES, INC.: $1.1M; #2 EAST ALABAMA PAVING COMPANY, INC.: $1.2M | $1.1M | $2.3M | $34,286 |
Back to the state market · How results are calculated
Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.