Letting results · Alabama Department of Transportation

January 26, 2024 letting results

Fast-published project results from the freshest available state snapshot.

22trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
AL-20240126053Call 0536#1 Elite Industrial Painting, Inc.: $407,634; #2 SOUTHERN COATINGS OF TARPON SPRINGS, LLC: $479,575; #3 OMEGA COATINGS & CONSTRUCTION, LLC: $588,100; #4 MONOKO, LLC: $655,056; #5 International Rigging Group, LLC: $734,158; #6 M & J CONSTRUCTION COMPANY OF PINELLAS: $809,133$407,634$3.7M$71,941
ATRP2-01-2023-001INTERSECTION IMPROVEMENTS (TWO-WAY LEFT TURN LANE ADDITION) ON SR-6 (US-82) BETWEEN CR-1 AND CR-37 SOUTHWEST5#1 ASPHALT CONTRACTORS, INC.: $930,380; #2 Cornerstone Civil Contractors, LLC: $1.2M; #3 APAC-ALABAMA, INC.: $1.3M; #4 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.4M; #5 MCELHENNEY CONSTRUCTION CO., LLC: $1.4M$930,380$6.3M$319,349
BR-0079(500)BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER5#1 WHITAKER CONTRACTING CORPORATION: $9.2M; #2 CARCEL & G. CONSTRUCTION, LLC: $10.7M; #3 CHILTON CONTRACTORS, INC.: $11.4M; #4 WRIGHT BROTHERS CONSTRUCTION COMPANY, INC.: $11.9M; #5 Dement Construction Company, LLC: $13.3M$9.2M$56.5M$1.6M
NH-0002(604)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) FROM THE INTERSECTION OF SHAW ROAD TO THE4#1 GRAYSON CARTER & SON CONTRACTING, INC.: $2.2M; #2 ROGERS GROUP, INC.: $2.2M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.7M; #4 APAC-ALABAMA, INC.: $3.0M$2.2M$10.2M$16,553
NH-0009(593)RESURFACE (SCRUB SEAL & MICRO-SURFACING SEAL COAT, TYPE II) ON SR-9 (US-331) FROM 0.500 MILE SOUTH OF THE2#1 WHITAKER CONTRACTING CORPORATION: $3.0M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.6M$3.0M$6.6M$642,840
NH-0020(533)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-20 FROM THE COLBERT COUNTY LINE TO THE JUNCTION OF CR-5854#1 ROGERS GROUP, INC.: $2.0M; #2 GRAYSON CARTER & SON CONTRACTING, INC.: $2.0M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.5M; #4 APAC-ALABAMA, INC.: $2.5M$2.0M$9.1M$32,481
NH-0021(578)RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 (US-231) IN ROCKFORD FROM 0.560 MILE SOUTH OF THE2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.5M; #2 GARY INGRAM GRADING & PAVING, INC.: $1.5M$1.5M$3.0M$4,151
NH-0035(538)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-35 FROM THE JUNCTION OF SR-273 TO THE DEKALB COUNTY LINE2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $975,509; #2 WHITAKER CONTRACTING CORPORATION: $1.3M$975,509$2.3M$313,967
NH-FMGR-HSIP-0008(610)RESURFACE, GUARDRAIL, STEEL BLOCKOUT REPLACE, AND STRIPE ON SR-8 (US-80) FROM THE JUNCTION OF LEE AVENUE TO1#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $3.2M$3.2M$3.2MNot available
NH-HSIP-0016(536)PLANE, RESURFACE, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON SR-16 (US-90) FROM THE EAST ABUTMENT OF THE FOWL3#1 H. O. WEAVER & SONS, INC.: $4.9M; #2 MOBILE ASPHALT COMPANY, LLC: $5.6M; #3 JOHN G. WALTON CONSTRUCTION COMPANY, INC.: $6.2M$4.9M$16.6M$697,644
RAED-031-052-003, RAED-031-052-005ADDITIONAL LANES AND ROUTE RELOCATION ON SR-52 FROM EAST OF COX STREET IN SLOCOMB TO THE JUNCTION OF SCOTT4#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $23.0M; #2 W. S. NEWELL & SONS, INC.: $23.9M; #3 S. A. GRAHAM COMPANY, INC.: $24.0M; #4 CHILTON CONTRACTORS, INC.: $32.5M$23.0M$103.3M$874,080
STPAA-0015(542)PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-15 (US-29) FROM A POINT NORTH OF THE SR-53 (US-231) OVERPASS TO2#1 APAC-ALABAMA, INC.: $1.6M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.6M$1.6M$3.1M$12,620
STPAA-0041(526)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-41 FROM THE I-65 INTERCHANGE (MP 24.529) TO THE JUNCTION OF3#1 MOBILE ASPHALT COMPANY, LLC: $2.0M; #2 APAC-ALABAMA, INC.: $2.1M; #3 H. O. WEAVER & SONS, INC.: $2.2M$2.0M$6.2M$115,926
STPAA-0071(503)MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-71 FROM THE JUNCTION OF SR-35 IN SECTION TO3#1 ROGERS GROUP, INC.: $1.9M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.9M; #3 WHITAKER CONTRACTING CORPORATION: $2.0M$1.9M$5.8M$36,668
STPAA-0110(507)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-110 FROM 0.400 MILE EAST OF THE JUNCTION OF CR-7 TO THE2#1 WHITAKER CONTRACTING CORPORATION: $1.4M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.8M$1.4M$3.1M$372,396
STPAA-FMGR-0010(564)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-10 FROM THE JUNCTION OF CR-41 (BLUE SPRINGS TOWN LIMITS)2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.1M; #2 APAC-ALABAMA, INC.: $3.3M$3.1M$6.4M$242,150
STPAA-HSIP-0014(557)RESURFACING, TRAFFIC STRIPE, AND TRAFFIC SIGN IMPROVEMENTS ON SR-14 FROM THE JUNCTION OF SR-63 TO THE2#1 WHITAKER CONTRACTING CORPORATION: $1.3M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.4M$1.3M$2.6M$99,447
STPAA-HSIP-0017(592)SAFETY WIDEN, RESURFACE, GUARDRAIL INSTALL, & STRIPE ON SR-17 FROM THE JUNCTION OF OLD REFORM ROAD TO THE1#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $3.4M$3.4M$3.4MNot available
STPAA-HSIP-0034(503)RESURFACING, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-34 FROM THE ST. CLAIR COUNTY LINE TO THE2#1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $3.4M; #2 APAC-ALABAMA, INC.: $4.0M$3.4M$7.5M$613,404
STPAA-HSIP-0048(507)MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-48 FROM 0.280 MILE WEST OF THE JUNCTION OF CR-2#1 APAC-ALABAMA, INC.: $4.1M; #2 GARY INGRAM GRADING & PAVING, INC.: $4.2M$4.1M$8.3M$52,245
STPAA-HSIP-0052(521)SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND STRIPE ON SR-52 FROM THE INTERSECTION OF LINE STREET IN3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.8M; #2 SOUTHEAST CONSTRUCTION COMPANY, LLC: $3.3M; #3 APAC-ALABAMA, INC.: $3.9M$2.8M$10.1M$570,012
STPSU-0819(255)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON GEORGE DOUTHIT DRIVE SOUTHWEST FROM THE JUNCTION OF3#1 APAC-ALABAMA, INC.: $565,688; #2 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $627,462; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $665,153$565,688$1.9M$61,773

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.