Letting results · Alabama Department of Transportation

August 25, 2023 letting results

Fast-published project results from the freshest available state snapshot.

10trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
AL-20230825032SR-10 OVER THE PEA RIVER7#1 SOUTHERN COATINGS OF TARPON SPRINGS, LLC: $624,000; #2 OMEGA COATINGS & CONSTRUCTION, LLC: $626,255; #3 Gulf Coast Contracting, LLC: $694,366; #4 Seminole Equipment, Inc.: $883,190; #5 M & J CONSTRUCTION COMPANY OF PINELLAS: $1.1M; #6 Olympus Painting Contractors, Inc.: $1.2M; #7 Southern Road & Bridge, LLC: $1.6M$624,000$6.7M$2,255
ATRP2-45-2021-045TURN LANE ADDITIONS AND TRAFFIC SIGNAL IMPROVEMENTS ON SR-53 AT HARVEST ROAD AND ON SR-53 FROM THE4#1 ROGERS GROUP, INC.: $3.2M; #2 S J & L GENERAL CONTRACTOR, LLC: $3.6M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.7M; #4 GRAYSON CARTER & SON CONTRACTING, INC.: $3.7M$3.2M$14.1M$358,850
ATRP2-58-2020-462INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNAL) ON SR-7 (US-11) AT SR-174 AND CR-9 TO INCLUDE TURN4#1 CHILTON CONTRACTORS, INC.: $2.4M; #2 TAYLOR CORPORATION: $2.6M; #3 WRIGHT BROTHERS CONSTRUCTION COMPANY, INC.: $3.1M; #4 WHITAKER CONTRACTING CORPORATION: $4.4M$2.4M$12.6M$237,593
ATRP2-64-2022-291ROADWAY AND ACCESS MANAGEMENT IMPROVEMENTS ON SR-5 (US-78A) AT JONES DAIRY ROAD IN JASPER2#1 DUNN CONSTRUCTION COMPANY, INC.: $1.0M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.2M$1.0M$2.3M$200,851
BR-0052(520)BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-52 OVER THE CHATTAHOOCHEE RIVER2#1 American Contracting & Services, Inc.: $1.3M; #2 Gibson & Associates, Inc.: $1.3M$1.3M$2.6M$249
HRRR-1222(250)WIDENING, RESURFACING, AND TRAFFIC STRIPE ON MOSLEY BRIDGE ROAD FROM THE JUNCTION OF SR-17 TO THE1#1 H. O. WEAVER & SONS, INC.: $280,713$280,713$280,713Not available
HRRR-6023(250)GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATIONS ON CR-2 OVER AN UNNAMED BRANCH WEST OF YORK2#1 C & H Construction Services, LLC: $93,677; #2 ALABAMA GUARDRAIL, INC.: $118,935$93,677$212,612$25,258
IM-I059(436), IM-I059(437)RESURFACE (MICRO-SURFACING SEAL COAT, TYPE II & III), STRIPE ON I-59 FROM A POINT NORTH OF EXIT 1 (MP 1.690) TO A POINT2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $6.4M; #2 WHITAKER CONTRACTING CORPORATION: $6.7M$6.4M$13.1M$328,258
STPMN-0121(251), STPMN-0121(252)PLANING, RESURFACING, AND TRAFFIC STRIPE ON DOSTER ROAD FROM FLEETWOOD ROAD TO SR-3 AND ON LOWER KINGSTON3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $932,573; #2 ASPHALT CONTRACTORS, INC.: $970,958; #3 MIDSOUTH PAVING, INC.: $1.1M$932,573$3.0M$38,385
STPSU-0823(250)PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON EULATION GATE ROAD AND OFF RAMP FROM A POINT NEAR3#1 MIDSOUTH PAVING, INC.: $434,791; #2 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $438,581; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $467,495$434,791$1.3M$3,790

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.