ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
ATRP2-05-2021-005ROADWAY IMPROVEMENTS (LEFT TURN LANE ADDITION) ON SR-75 NORTH AT CR-26 SOUTHWEST OF SUSAN MOORE1#1 WHITAKER CONTRACTING CORPORATION: $521,748$521,748$521,748Not available
ATRP2-28-2020-223INTERSECTION AND ROADWAY IMPROVEMENTS (LANE RECONFIGURATION) ON SR-1 (US-278/US-431) AT SR-291 (HOOD AVENUE)1#1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $1.1M$1.1M$1.1MNot available
BR-I059(428)BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHAB) ON I-20/I-59 (NORTHBOUND ROADWAY) FROM MP 63.721 TO MP 72.0643#1 COMANCHE CONSTRUCTION OF GEORGIA, LLC: $4.6M; #2 American Contracting & Services, Inc.: $5.2M; #3 Gibson & Associates, Inc.: $5.8M$4.6M$15.6M$550,813
BUILDF-NHF-0002(516)ADDITIONAL LANES (GRADE, DRAIN, PAVE, SIGNALS, AND STRIPE) ON SR-2 (US 72/FLORENCE BOULEVARD) FROM THE JUNCTION3#1 GRAYSON CARTER & SON CONTRACTING, INC.: $24.0M; #2 CARCEL & G. CONSTRUCTION, LLC: $28.8M; #3 MIDSOUTH PAVING, INC.: $31.4M$24.0M$84.1M$4.8M
HRRR-6122(250)ROADWAY SAFETY IMPROVEMENTS ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS1#1 Ozark Striping Company, LLC: $169,085$169,085$169,085Not available
HSIP-0013(620), ATRP2-13-2021-013ROADWAY IMPROVEMENTS (CENTER TURN LANE ADDITION) ON SR-13 (US-43) FROM THE JUNCTION OF GAIL DRIVE TO THE2#1 PINE CITY CONTRACTING, LLC: $1.7M; #2 MCELHENNEY CONSTRUCTION CO., LLC: $2.0M$1.7M$3.8M$325,606
IM-I065(524)OGFC SURFACE TREATMENT AND MICRO-SURFACING ON I-65 FROM THE SR-3 (US-31) OVERPASS TO THE SR-145 OVERPASS IN2#1 DUNN CONSTRUCTION COMPANY, INC.: $3.1M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.4M$3.1M$6.5M$255,022
IM-I065(528)WELCOME CENTER REPLACEMENT (BUILDING ONLY) ON I-65 NORTH OF ATHENS3#1 CONSOLIDATED CONSTRUCTION CO. OF ALA.: $8.0M; #2 B. H. CRAIG CONSTRUCTION COMPANY, INC.: $8.4M; #3 BRAD SLATER CONSTRUCTION, LLC: $9.2M$8.0M$25.5M$466,000
IM-I459(321)MICRO-MILLING, OGFC SAFETY TREATMENT, AND TRAFFIC STRIPE ON I-459 FROM THE GRANTS MILL ROAD OVERPASS TO A3#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.2M; #2 DUNN CONSTRUCTION COMPANY, INC.: $4.3M; #3 MIDSOUTH PAVING, INC.: $4.6M$4.2M$13.0M$92,158
NH-0001(628)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (U.S. 231/431) FROM THE JUNCTION OF CEDARAMA DRIVE4#1 ROGERS GROUP, INC.: $4.6M; #2 S J & L GENERAL CONTRACTOR, LLC: $4.6M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.0M; #4 MIDSOUTH PAVING, INC.: $5.6M$4.6M$19.7M$19,682
NH-0003(650)PLANING, RESURFACING, GUARDRAIL REPLACEMENT, AND STRIPE ON SR-3 (US-31) FROM 0.300 MILE SOUTH OF THE RAILROAD2#1 H. O. WEAVER & SONS, INC.: $1.5M; #2 MOBILE ASPHALT COMPANY, LLC: $1.6M$1.5M$3.1M$22,494
NH-0008(606), HSIP-0008(605)PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-8 (US-80) FROM 0.700 MILE WEST OF THE JUNCTION OF STREETY ROAD TO3#1 ASPHALT CONTRACTORS, INC.: $3.5M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.8M; #3 MIDSOUTH PAVING, INC.: $4.3M$3.5M$11.6M$255,963
NH-FMGR-HSIP-0152(500)RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND TRAFFIC STRIPE ON SR-152 FROM THE I-65 INTERCHANGE TO THE SR-9 (US-3#1 ASPHALT CONTRACTORS, INC.: $4.7M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.8M; #3 MIDSOUTH PAVING, INC.: $6.4M$4.7M$15.9M$64,449
NH-HSIP-0001(626)MICRO-MILL, RESURFACING, BRIDGE GUARDRAIL RETRO, AND STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF SR-144 TO A3#1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $4.5M; #2 MIDSOUTH PAVING, INC.: $4.8M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.6M$4.5M$14.8M$227,792
RP-STPAA-HSIP-0010(558)SAFETY WIDENING, MICRO-MILLING, RESURFACE, & STRIPE ON SR-10 FROM A POINT JUST EAST OF VANN MILL CREEK (MP2#1 MIDSOUTH PAVING, INC.: $4.7M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.0M$4.7M$9.7M$352,253
STPAA-0040(504)MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, AND STRIPE ON SR-40 FROM THE INTERSECTION OF SR-713#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $6.1M; #2 WHITAKER CONTRACTING CORPORATION: $6.1M; #3 ROGERS GROUP, INC.: $6.4M$6.1M$18.7M$12,473
STPAA-0136(501), ATRP2-50-2022-202RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON SR-136 FROM THE JUNCTION OF SR-21 SOUTHWEST OF MONROEVILLE TO2#1 MOBILE ASPHALT COMPANY, LLC: $1.8M; #2 H. O. WEAVER & SONS, INC.: $1.9M$1.8M$3.6M$60,347
STPMN-0120(252)WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-27 FROM SR-14 TO CR-29 AND ON CR-29 FROM CR-27 TO SR-143#1 ASPHALT CONTRACTORS, INC.: $1.1M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.1M; #3 MIDSOUTH PAVING, INC.: $1.1M$1.1M$3.3M$43,573
STPNU-0006(595)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE BULLOCK COUNTY LINE TO THE JUNCTION OF2#1 MIDSOUTH PAVING, INC.: $2.9M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.6M$2.9M$6.5M$685,625
STPNU-0051(521)RESURFACING AND TRAFFIC STRIPE ON SR-51 FROM THE JUNCTION OF SR-239 TO THE BULLOCK COUNTY LINE2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.2M; #2 MIDSOUTH PAVING, INC.: $3.3M$3.2M$6.5M$29,758
STPNU-1623(250)PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-636 FROM THE JUNCTION OF SR-87 TO THE JUNCTION OF SR-27 SOUTH OF2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.8M; #2 MIDSOUTH PAVING, INC.: $1.9M$1.8M$3.7M$132,557
STPNU-HSIP-0018(513)SAFETY WIDENING, RESURFACING, BRIDGE RAIL RETROFIT, & STRIPE ON SR-18 (US-43) FROM 0.260 MILE EAST OF THE JUNCTION1#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $4.9M$4.9M$4.9MNot available
STPNU-HSIP-0021(580), STPNU-0047(507)RESURFACING, AND STRIPE TO INCLUDE TRAFFIC SIGNAL UPGRADES ON SR-21 FROM SR-41 TO SR-47 AND ON SR-47 FROM SR-2#1 MOBILE ASPHALT COMPANY, LLC: $1.7M; #2 H. O. WEAVER & SONS, INC.: $1.8M$1.7M$3.5M$43,917
STPNU-HSIP-0086(503)SAFETY WIDENING, RESURFACING (SCRUB SEAL), GUARDRAIL, STRIPE ON SR-86 FROM 0.320 MILE EAST OF THE JUNCTION OF1#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $2.8M$2.8M$2.8MNot available
TAPBH-CRPBH-CMAQ-3715(262)Call 0585#1 TAYLOR & MIREE CONSTRUCTION, INC: $2.6M; #2 GILLESPIE CONSTRUCTION, LLC: $3.2M; #3 BULLS CONSTRUCTION GROUP, LLC: $3.4M; #4 RUSSO CORPORATION: $3.7M; #5 CARCEL & G. CONSTRUCTION, LLC: $3.8M$2.6M$16.7M$653,779