Letting results · Alabama Department of Transportation
February 24, 2023 letting results
Fast-published project results from the freshest available state snapshot.
25trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| ATRP2-05-2021-005 | ROADWAY IMPROVEMENTS (LEFT TURN LANE ADDITION) ON SR-75 NORTH AT CR-26 SOUTHWEST OF SUSAN MOORE | 1 | #1 WHITAKER CONTRACTING CORPORATION: $521,748 | $521,748 | $521,748 | Not available |
| ATRP2-28-2020-223 | INTERSECTION AND ROADWAY IMPROVEMENTS (LANE RECONFIGURATION) ON SR-1 (US-278/US-431) AT SR-291 (HOOD AVENUE) | 1 | #1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $1.1M | $1.1M | $1.1M | Not available |
| BR-I059(428) | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHAB) ON I-20/I-59 (NORTHBOUND ROADWAY) FROM MP 63.721 TO MP 72.064 | 3 | #1 COMANCHE CONSTRUCTION OF GEORGIA, LLC: $4.6M; #2 American Contracting & Services, Inc.: $5.2M; #3 Gibson & Associates, Inc.: $5.8M | $4.6M | $15.6M | $550,813 |
| BUILDF-NHF-0002(516) | ADDITIONAL LANES (GRADE, DRAIN, PAVE, SIGNALS, AND STRIPE) ON SR-2 (US 72/FLORENCE BOULEVARD) FROM THE JUNCTION | 3 | #1 GRAYSON CARTER & SON CONTRACTING, INC.: $24.0M; #2 CARCEL & G. CONSTRUCTION, LLC: $28.8M; #3 MIDSOUTH PAVING, INC.: $31.4M | $24.0M | $84.1M | $4.8M |
| HRRR-6122(250) | ROADWAY SAFETY IMPROVEMENTS ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS | 1 | #1 Ozark Striping Company, LLC: $169,085 | $169,085 | $169,085 | Not available |
| HSIP-0013(620), ATRP2-13-2021-013 | ROADWAY IMPROVEMENTS (CENTER TURN LANE ADDITION) ON SR-13 (US-43) FROM THE JUNCTION OF GAIL DRIVE TO THE | 2 | #1 PINE CITY CONTRACTING, LLC: $1.7M; #2 MCELHENNEY CONSTRUCTION CO., LLC: $2.0M | $1.7M | $3.8M | $325,606 |
| IM-I065(524) | OGFC SURFACE TREATMENT AND MICRO-SURFACING ON I-65 FROM THE SR-3 (US-31) OVERPASS TO THE SR-145 OVERPASS IN | 2 | #1 DUNN CONSTRUCTION COMPANY, INC.: $3.1M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.4M | $3.1M | $6.5M | $255,022 |
| IM-I065(528) | WELCOME CENTER REPLACEMENT (BUILDING ONLY) ON I-65 NORTH OF ATHENS | 3 | #1 CONSOLIDATED CONSTRUCTION CO. OF ALA.: $8.0M; #2 B. H. CRAIG CONSTRUCTION COMPANY, INC.: $8.4M; #3 BRAD SLATER CONSTRUCTION, LLC: $9.2M | $8.0M | $25.5M | $466,000 |
| IM-I459(321) | MICRO-MILLING, OGFC SAFETY TREATMENT, AND TRAFFIC STRIPE ON I-459 FROM THE GRANTS MILL ROAD OVERPASS TO A | 3 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.2M; #2 DUNN CONSTRUCTION COMPANY, INC.: $4.3M; #3 MIDSOUTH PAVING, INC.: $4.6M | $4.2M | $13.0M | $92,158 |
| NH-0001(628) | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (U.S. 231/431) FROM THE JUNCTION OF CEDARAMA DRIVE | 4 | #1 ROGERS GROUP, INC.: $4.6M; #2 S J & L GENERAL CONTRACTOR, LLC: $4.6M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.0M; #4 MIDSOUTH PAVING, INC.: $5.6M | $4.6M | $19.7M | $19,682 |
| NH-0003(650) | PLANING, RESURFACING, GUARDRAIL REPLACEMENT, AND STRIPE ON SR-3 (US-31) FROM 0.300 MILE SOUTH OF THE RAILROAD | 2 | #1 H. O. WEAVER & SONS, INC.: $1.5M; #2 MOBILE ASPHALT COMPANY, LLC: $1.6M | $1.5M | $3.1M | $22,494 |
| NH-0008(606), HSIP-0008(605) | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-8 (US-80) FROM 0.700 MILE WEST OF THE JUNCTION OF STREETY ROAD TO | 3 | #1 ASPHALT CONTRACTORS, INC.: $3.5M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.8M; #3 MIDSOUTH PAVING, INC.: $4.3M | $3.5M | $11.6M | $255,963 |
| NH-FMGR-HSIP-0152(500) | RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND TRAFFIC STRIPE ON SR-152 FROM THE I-65 INTERCHANGE TO THE SR-9 (US- | 3 | #1 ASPHALT CONTRACTORS, INC.: $4.7M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $4.8M; #3 MIDSOUTH PAVING, INC.: $6.4M | $4.7M | $15.9M | $64,449 |
| NH-HSIP-0001(626) | MICRO-MILL, RESURFACING, BRIDGE GUARDRAIL RETRO, AND STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF SR-144 TO A | 3 | #1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $4.5M; #2 MIDSOUTH PAVING, INC.: $4.8M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.6M | $4.5M | $14.8M | $227,792 |
| RP-STPAA-HSIP-0010(558) | SAFETY WIDENING, MICRO-MILLING, RESURFACE, & STRIPE ON SR-10 FROM A POINT JUST EAST OF VANN MILL CREEK (MP | 2 | #1 MIDSOUTH PAVING, INC.: $4.7M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.0M | $4.7M | $9.7M | $352,253 |
| STPAA-0040(504) | MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, AND STRIPE ON SR-40 FROM THE INTERSECTION OF SR-71 | 3 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $6.1M; #2 WHITAKER CONTRACTING CORPORATION: $6.1M; #3 ROGERS GROUP, INC.: $6.4M | $6.1M | $18.7M | $12,473 |
| STPAA-0136(501), ATRP2-50-2022-202 | RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON SR-136 FROM THE JUNCTION OF SR-21 SOUTHWEST OF MONROEVILLE TO | 2 | #1 MOBILE ASPHALT COMPANY, LLC: $1.8M; #2 H. O. WEAVER & SONS, INC.: $1.9M | $1.8M | $3.6M | $60,347 |
| STPMN-0120(252) | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-27 FROM SR-14 TO CR-29 AND ON CR-29 FROM CR-27 TO SR-14 | 3 | #1 ASPHALT CONTRACTORS, INC.: $1.1M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.1M; #3 MIDSOUTH PAVING, INC.: $1.1M | $1.1M | $3.3M | $43,573 |
| STPNU-0006(595) | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE BULLOCK COUNTY LINE TO THE JUNCTION OF | 2 | #1 MIDSOUTH PAVING, INC.: $2.9M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.6M | $2.9M | $6.5M | $685,625 |
| STPNU-0051(521) | RESURFACING AND TRAFFIC STRIPE ON SR-51 FROM THE JUNCTION OF SR-239 TO THE BULLOCK COUNTY LINE | 2 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.2M; #2 MIDSOUTH PAVING, INC.: $3.3M | $3.2M | $6.5M | $29,758 |
| STPNU-1623(250) | PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-636 FROM THE JUNCTION OF SR-87 TO THE JUNCTION OF SR-27 SOUTH OF | 2 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.8M; #2 MIDSOUTH PAVING, INC.: $1.9M | $1.8M | $3.7M | $132,557 |
| STPNU-HSIP-0018(513) | SAFETY WIDENING, RESURFACING, BRIDGE RAIL RETROFIT, & STRIPE ON SR-18 (US-43) FROM 0.260 MILE EAST OF THE JUNCTION | 1 | #1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $4.9M | $4.9M | $4.9M | Not available |
| STPNU-HSIP-0021(580), STPNU-0047(507) | RESURFACING, AND STRIPE TO INCLUDE TRAFFIC SIGNAL UPGRADES ON SR-21 FROM SR-41 TO SR-47 AND ON SR-47 FROM SR- | 2 | #1 MOBILE ASPHALT COMPANY, LLC: $1.7M; #2 H. O. WEAVER & SONS, INC.: $1.8M | $1.7M | $3.5M | $43,917 |
| STPNU-HSIP-0086(503) | SAFETY WIDENING, RESURFACING (SCRUB SEAL), GUARDRAIL, STRIPE ON SR-86 FROM 0.320 MILE EAST OF THE JUNCTION OF | 1 | #1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $2.8M | $2.8M | $2.8M | Not available |
| TAPBH-CRPBH-CMAQ-3715(262) | Call 058 | 5 | #1 TAYLOR & MIREE CONSTRUCTION, INC: $2.6M; #2 GILLESPIE CONSTRUCTION, LLC: $3.2M; #3 BULLS CONSTRUCTION GROUP, LLC: $3.4M; #4 RUSSO CORPORATION: $3.7M; #5 CARCEL & G. CONSTRUCTION, LLC: $3.8M | $2.6M | $16.7M | $653,779 |