Letting results · Alabama Department of Transportation

September 30, 2022 letting results

Fast-published project results from the freshest available state snapshot.

19trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
AL-20220930060RESURFACING (MICRO-SURFACING SEAL COAT) AND TRAFFIC STRIPE ON SR-110 FROM THE MONTGOMERY COUNTY LINE TO A1#1 WHITAKER CONTRACTING CORPORATION: $1.8M$1.8M$1.8MNot available
ATRP2-41-2022-456Call 0441#1 MCELHENNEY CONSTRUCTION CO., LLC: $486,516$486,516$486,516Not available
BR-0012(576)BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-12 (US-84) OVER THE CHATTAHOOCHEE RIVER (MP5#1 Gibson & Associates, Inc.: $2.5M; #2 COMANCHE CONSTRUCTION OF GEORGIA, LLC: $2.8M; #3 American Contracting & Services, Inc.: $2.8M; #4 Cekra, Inc.: $3.8M; #5 M & J CONSTRUCTION COMPANY OF PINELLAS: $4.4M$2.5M$16.2M$254,894
CRPAA-0042(543)UPGRADE ROADWAY LIGHTING LUMINAIRES ON SR-42 (US-98) IN THE BANKHEAD TUNNEL IN MOBILE2#1 BILL SMITH ELECTRIC, INC.: $1.1M; #2 INLINE, LLC: $1.3M$1.1M$2.4M$147,502
CRPAA-I065(518)INSTALLATION OF ITS INFRASTRUCTURE TO SURPORT ADVANCED CORRIDOR MANAGEMENT ON I-65/SR-3 (US-31)2#1 INLINE, LLC: $3.7M; #2 STANSELL ELECTRIC CO., INC.: $3.7M$3.7M$7.4M$64,697
FBD-NR21(916)DOCK REPAIRS AT THE MOBILE FERRY DOCK (EAST DOCK) IN DAUPHIN ISLAND.1#1 MCELHENNEY CONSTRUCTION CO., LLC: $1.1M$1.1M$1.1MNot available
HRRR-0122(250)SAFETY IMPROVEMENTS (SAFETY WIDENING, RESURFACING, & STRIPE) ON CR-40 FROM THE JUNCTION OF CR-69 TO THE3#1 MIDSOUTH PAVING, INC.: $427,958; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $447,979; #3 ASPHALT CONTRACTORS, INC.: $448,039$427,958$1.3M$20,021
HSIP-0001(617)INTERSECTION IMPROVEMENTS, ACCEL LANE, SIGNALS, AND STRIPE ON SR-1 (US-431) AT SR-79 NORTHEAST OF GUNTERSVILLE2#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.3M; #2 WHITAKER CONTRACTING CORPORATION: $1.4M$1.3M$2.7M$43,570
HSIP-0167(514)ROUNDABOUT (GRADING, DRAINAGE, PAVEMENT, LIGHTING, & STRIPE) ON SR-167 AT SR-87 (MP 52.194 TO MP 54.207) SOUTH OF2#1 S. A. GRAHAM COMPANY, INC.: $3.4M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.5M$3.4M$6.9M$39,539
IM-I065(497)BRIDGE REPLACEMENTS (GRADE, DRAIN, PAVE, AND BRIDGE) ON I-65 OVER THE SEPULGA RIVER AND RELIEF NORTHEAST OF2#1 MCINNIS CONSTRUCTION, LLC: $40.9M; #2 SCOTT BRIDGE COMPANY, INC.: $47.2M$40.9M$88.0M$6.3M
RACR-002-000-015CONNECTOR ROAD (GRADE, DRAIN, PAVE, BRIDGE, LIGHTS) ON SR-161 FROM THE JUNCTION SR-180 TO A POINT NORTH OF THE4#1 SCOTT BRIDGE COMPANY, INC.: $51.9M; #2 MCINNIS CONSTRUCTION LLC & F & W: $53.8M; #3 BRASFIELD & GORRIE, L.L.C.: $64.6M; #4 W. G. Yates & Sons Construction Company: $67.1M$51.9M$237.4M$1.9M
RACR-041-014-001ROADWAY IMPROVEMENTS (CONCRETE PAVING & TRAFFIC STRIPE) ON SR-14 AT THE QUARRY ENTRANCE AT APPROXIMATELY3#1 ABRAMSON, LLC: $1.6M; #2 GROUT, INCORPORATED: $1.7M; #3 BULLS CONSTRUCTION GROUP, LLC: $2.3M$1.6M$5.5M$117,309
RAED-031-052-006DEMOLITION AND STRUCTURE REMOVAL ON SR-52 FROM EAST OF COX STREET (MP 48.856) IN SLOCOMB TO EAST OF2#1 GRADY RALLS & SONS, INC.: $499,804; #2 MCELHENNEY CONSTRUCTION CO., LLC: $583,613$499,804$1.1M$83,809
STPMN-5121(250)RESURFACING AND TRAFFIC STRIPE ON WADSEN ROAD FROM THE LOWNDES COUNTY LINE TO LAMAR ROAD AND ON LAMAR3#1 MIDSOUTH PAVING, INC.: $1.2M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.3M; #3 ASPHALT CONTRACTORS, INC.: $1.5M$1.2M$4.0M$107,277
STPNU-0017(590), ATRP2-38-2021-500MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-17 FROM THE JUNCTION OF CR-9 TO THE JUNCTION OF CR-29 IN1#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $662,139$662,139$662,139Not available
STPSU-0819(254)RESURFACING AND TRAFFIC STRIPE ON COUNTRY CLUB DRIVE SOUTHWEST AND HENRY ROAD FROM THE JUNCTION OF3#1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $982,864; #2 MIDSOUTH PAVING, INC.: $1.1M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.1M$982,864$3.1M$87,858
STPSU-3520(251), STPSU-3521(251), STPSU-RESURFACING AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS2#1 MIDSOUTH PAVING, INC.: $2.6M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.7M$2.6M$5.3M$105,460
STPSU-5220(252)RECONSTRUCTION (GRADING, PAVEMENT, AND TRAFFIC STRIPE) ON CR-684 (CHURCH STREET) FROM THE JUNCTION OF2#1 ROGERS GROUP, INC.: $1.8M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.1M$1.8M$3.9M$328,469
STPSU-6321(254)PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-84 (CHARLIE SHIRLEY ROAD) FROM THE JUNCTION OF SR-69 TO THE2#1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $1.2M; #2 MIDSOUTH PAVING, INC.: $1.3M$1.2M$2.5M$137,470

Back to the state market · How results are calculated

Last updated September 16, 2026 with source data through August 28, 2026. See the methodology and data dictionary or report a correction.