Letting results · Alabama Department of Transportation
September 30, 2022 letting results
Fast-published project results from the freshest available state snapshot.
19trusted project results recorded on this date.
| Project | Description | Bidders | Bidder amounts and ranks | Low bid | Total bids | First–second gap |
|---|---|---|---|---|---|---|
| AL-20220930060 | RESURFACING (MICRO-SURFACING SEAL COAT) AND TRAFFIC STRIPE ON SR-110 FROM THE MONTGOMERY COUNTY LINE TO A | 1 | #1 WHITAKER CONTRACTING CORPORATION: $1.8M | $1.8M | $1.8M | Not available |
| ATRP2-41-2022-456 | Call 044 | 1 | #1 MCELHENNEY CONSTRUCTION CO., LLC: $486,516 | $486,516 | $486,516 | Not available |
| BR-0012(576) | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-12 (US-84) OVER THE CHATTAHOOCHEE RIVER (MP | 5 | #1 Gibson & Associates, Inc.: $2.5M; #2 COMANCHE CONSTRUCTION OF GEORGIA, LLC: $2.8M; #3 American Contracting & Services, Inc.: $2.8M; #4 Cekra, Inc.: $3.8M; #5 M & J CONSTRUCTION COMPANY OF PINELLAS: $4.4M | $2.5M | $16.2M | $254,894 |
| CRPAA-0042(543) | UPGRADE ROADWAY LIGHTING LUMINAIRES ON SR-42 (US-98) IN THE BANKHEAD TUNNEL IN MOBILE | 2 | #1 BILL SMITH ELECTRIC, INC.: $1.1M; #2 INLINE, LLC: $1.3M | $1.1M | $2.4M | $147,502 |
| CRPAA-I065(518) | INSTALLATION OF ITS INFRASTRUCTURE TO SURPORT ADVANCED CORRIDOR MANAGEMENT ON I-65/SR-3 (US-31) | 2 | #1 INLINE, LLC: $3.7M; #2 STANSELL ELECTRIC CO., INC.: $3.7M | $3.7M | $7.4M | $64,697 |
| FBD-NR21(916) | DOCK REPAIRS AT THE MOBILE FERRY DOCK (EAST DOCK) IN DAUPHIN ISLAND. | 1 | #1 MCELHENNEY CONSTRUCTION CO., LLC: $1.1M | $1.1M | $1.1M | Not available |
| HRRR-0122(250) | SAFETY IMPROVEMENTS (SAFETY WIDENING, RESURFACING, & STRIPE) ON CR-40 FROM THE JUNCTION OF CR-69 TO THE | 3 | #1 MIDSOUTH PAVING, INC.: $427,958; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $447,979; #3 ASPHALT CONTRACTORS, INC.: $448,039 | $427,958 | $1.3M | $20,021 |
| HSIP-0001(617) | INTERSECTION IMPROVEMENTS, ACCEL LANE, SIGNALS, AND STRIPE ON SR-1 (US-431) AT SR-79 NORTHEAST OF GUNTERSVILLE | 2 | #1 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.3M; #2 WHITAKER CONTRACTING CORPORATION: $1.4M | $1.3M | $2.7M | $43,570 |
| HSIP-0167(514) | ROUNDABOUT (GRADING, DRAINAGE, PAVEMENT, LIGHTING, & STRIPE) ON SR-167 AT SR-87 (MP 52.194 TO MP 54.207) SOUTH OF | 2 | #1 S. A. GRAHAM COMPANY, INC.: $3.4M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.5M | $3.4M | $6.9M | $39,539 |
| IM-I065(497) | BRIDGE REPLACEMENTS (GRADE, DRAIN, PAVE, AND BRIDGE) ON I-65 OVER THE SEPULGA RIVER AND RELIEF NORTHEAST OF | 2 | #1 MCINNIS CONSTRUCTION, LLC: $40.9M; #2 SCOTT BRIDGE COMPANY, INC.: $47.2M | $40.9M | $88.0M | $6.3M |
| RACR-002-000-015 | CONNECTOR ROAD (GRADE, DRAIN, PAVE, BRIDGE, LIGHTS) ON SR-161 FROM THE JUNCTION SR-180 TO A POINT NORTH OF THE | 4 | #1 SCOTT BRIDGE COMPANY, INC.: $51.9M; #2 MCINNIS CONSTRUCTION LLC & F & W: $53.8M; #3 BRASFIELD & GORRIE, L.L.C.: $64.6M; #4 W. G. Yates & Sons Construction Company: $67.1M | $51.9M | $237.4M | $1.9M |
| RACR-041-014-001 | ROADWAY IMPROVEMENTS (CONCRETE PAVING & TRAFFIC STRIPE) ON SR-14 AT THE QUARRY ENTRANCE AT APPROXIMATELY | 3 | #1 ABRAMSON, LLC: $1.6M; #2 GROUT, INCORPORATED: $1.7M; #3 BULLS CONSTRUCTION GROUP, LLC: $2.3M | $1.6M | $5.5M | $117,309 |
| RAED-031-052-006 | DEMOLITION AND STRUCTURE REMOVAL ON SR-52 FROM EAST OF COX STREET (MP 48.856) IN SLOCOMB TO EAST OF | 2 | #1 GRADY RALLS & SONS, INC.: $499,804; #2 MCELHENNEY CONSTRUCTION CO., LLC: $583,613 | $499,804 | $1.1M | $83,809 |
| STPMN-5121(250) | RESURFACING AND TRAFFIC STRIPE ON WADSEN ROAD FROM THE LOWNDES COUNTY LINE TO LAMAR ROAD AND ON LAMAR | 3 | #1 MIDSOUTH PAVING, INC.: $1.2M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.3M; #3 ASPHALT CONTRACTORS, INC.: $1.5M | $1.2M | $4.0M | $107,277 |
| STPNU-0017(590), ATRP2-38-2021-500 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-17 FROM THE JUNCTION OF CR-9 TO THE JUNCTION OF CR-29 IN | 1 | #1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $662,139 | $662,139 | $662,139 | Not available |
| STPSU-0819(254) | RESURFACING AND TRAFFIC STRIPE ON COUNTRY CLUB DRIVE SOUTHWEST AND HENRY ROAD FROM THE JUNCTION OF | 3 | #1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $982,864; #2 MIDSOUTH PAVING, INC.: $1.1M; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $1.1M | $982,864 | $3.1M | $87,858 |
| STPSU-3520(251), STPSU-3521(251), STPSU- | RESURFACING AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS | 2 | #1 MIDSOUTH PAVING, INC.: $2.6M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.7M | $2.6M | $5.3M | $105,460 |
| STPSU-5220(252) | RECONSTRUCTION (GRADING, PAVEMENT, AND TRAFFIC STRIPE) ON CR-684 (CHURCH STREET) FROM THE JUNCTION OF | 2 | #1 ROGERS GROUP, INC.: $1.8M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $2.1M | $1.8M | $3.9M | $328,469 |
| STPSU-6321(254) | PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-84 (CHARLIE SHIRLEY ROAD) FROM THE JUNCTION OF SR-69 TO THE | 2 | #1 S. T. BUNN CONSTRUCTION COMPANY, INC.: $1.2M; #2 MIDSOUTH PAVING, INC.: $1.3M | $1.2M | $2.5M | $137,470 |