Letting results · Alabama Department of Transportation

July 29, 2022 letting results

Fast-published project results from the freshest available state snapshot.

14trusted project results recorded on this date.
Apparent low bids and reported bidder counts.
ProjectDescriptionBiddersBidder amounts and ranksLow bidTotal bidsFirst–second gap
BR-0217(501)BRIDGE REPLACEMENT ON SR-217 OVER BIG CREEK SOUTHWEST OF CITRONELLE2#1 JOHN G. WALTON CONSTRUCTION COMPANY, INC.: $3.7M; #2 MCINNIS CONSTRUCTION, LLC: $3.9M$3.7M$7.6M$196,255
BR-0247(501)BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-247 OVER CEDAR CREEK6#1 THE BRIDGE BUILDERS OF ALABAMA, LLC: $4.4M; #2 MILLER & MILLER, INC.: $5.0M; #3 MCINNIS CONSTRUCTION, LLC: $5.6M; #4 WRIGHT BROTHERS CONSTRUCTION COMPANY, INC.: $5.6M; #5 Century Construction Group, Inc.: $5.6M; #6 Dement Construction Company, LLC: $5.9M$4.4M$32.1M$526,453
BR-I065(515)BRIDGE PAINTING ON I-65 AT VARIOUS LOCATION AS INDICATED IN THE PLANS8#1 S & D Industrial Painting, Inc.: $1.7M; #2 International Rigging Group, LLC: $2.6M; #3 Seminole Equipment, Inc.: $2.6M; #4 Gulf Coast Contracting, LLC: $3.0M; #5 K.V.K. Contracting, Inc.: $3.7M; #6 M & J CONSTRUCTION COMPANY OF PINELLAS: $4.2M; #7 Olympus Painting Contractors, Inc.: $4.2M; #8 Southern Road & Bridge, LLC: $4.5M$1.7M$26.4M$914,305
CMAQ-9802(911)GRADE, DRAIN, PAVE, BRIDGE, BOARDWALK, SIGNS, & LANDSCAPING SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL -3#1 CHILTON CONTRACTORS, INC.: $6.8M; #2 RUSSO CORPORATION: $8.0M; #3 BULLS CONSTRUCTION GROUP, LLC: $11.8M$6.8M$26.6M$1.3M
CRPAA-NR13(925)CURB RAMP INSTALLATIONS AND IMPROVEMENTS ON SR-14, SR-63, SR-111, SR-143, AND SR-229 AT VARIOUS LOCATIONS IN THE3#1 GLOBAL MANAGEMENT GROUP, INC.: $206,560; #2 MCELHENNEY CONSTRUCTION CO., LLC: $244,586; #3 GILLESPIE CONSTRUCTION, LLC: $252,860$206,560$704,006$38,026
CRPNU-NR13(944)SAFETY IMPROVEMENTS (CURB RAMP INSTALLATIONS) ON SR-171, SR-17, SR-18, AND SR-118 AT VARIOUS LOCATIONS IN THE WC2#1 GILLESPIE CONSTRUCTION, LLC: $576,829; #2 MCELHENNEY CONSTRUCTION CO., LLC: $725,628$576,829$1.3M$148,799
HRRR-6222(250)WIDENING, RESURFACING, SCORING, RUMBLE STRIPS, AND STRIPE ON CR-7 (CHAPEL ROAD) FROM THE NORTH CITY LIMITS OF1#1 GARY INGRAM GRADING & PAVING, INC.: $1.1M$1.1M$1.1MNot available
HSIP-0210(510)SAFETY IMPROVEMENTS (INTERSECTION MODIFICATIONS) ON SR-210 AT TIMBERS DRIVE IN DOTHAN3#1 MIDSOUTH PAVING, INC.: $676,604; #2 MCELHENNEY CONSTRUCTION CO., LLC: $865,768; #3 WIREGRASS CONSTRUCTION COMPANY, INC.: $870,892$676,604$2.4M$189,164
IM-I059(425)MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-59 FROM SOUTH OF THE SR-35 UNDERPASS TO NORTH OF THE SR-71#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $5.5M$5.5M$5.5MNot available
NH-0002(599)STRUCTURE DEMOLITION AND REMOVAL ON SR-2 (US-72/FLORENCE BOULEVARD) FROM THE JUNCTION OF CR-30 (INDIAN3#1 B. H. CRAIG CONSTRUCTION COMPANY, INC.: $291,626; #2 MLMD, LLC: $371,920; #3 E. O. BYARS CONSTRUCTION, INC.: $379,215$291,626$1.0M$80,294
RACR-059-003-008INTERSECTION IMPROVEMENTS (CONCRETE PAVEMENT) ON SR-3 (US-31) AT SR-25 (MP 242.798 TO MP 242.810) OUTSIDE2#1 ABRAMSON, LLC: $178,405; #2 CARCEL & G. CONSTRUCTION, LLC: $265,320$178,405$443,726$86,915
STPAA-0003(647), ATRP2-51-2022-349WIDENING, RESURFACING, AND TRAFFIC STRIPE ON SR-3 (US-31) AND THE I-65 SOUTHBOUND EXIT RAMP FROM THE I-652#1 WIREGRASS CONSTRUCTION COMPANY, INC.: $3.1M; #2 MIDSOUTH PAVING, INC.: $3.5M$3.1M$6.5M$429,613
STPAA-A115(900)ADDITIONAL LANES (GRADING, DRAINAGE, PAVEMENT, SIGNALS) ON SR-167 FROM THE JUNCTION OF SR-12 (US-84) TO A POINT2#1 S. A. GRAHAM COMPANY, INC.: $12.9M; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $13.2M$12.9M$26.1M$297,239
STPSU-0818(250)RESURFACING AND TRAFFIC STRIPE ON RUSSELL DRIVE FROM THE JUNCTION OF PEACEBURG ROAD TO THE JUNCTION OF3#1 VULCAN MATERIALS ASPHALT AND CONSTRUCTION,: $550,479; #2 WIREGRASS CONSTRUCTION COMPANY, INC.: $804,998; #3 MIDSOUTH PAVING, INC.: $966,156$550,479$2.3M$254,520